To calculate the refrigerant charge in a car, you must check its AC service valves under the hood in a car that is turned off using manifold gauges. Attach its red hose to the high-pressure gauge and the blue hose to the low-pressure gauge. Open the pressure valve on both sides. The normal low should be 25 to 45 psi. The normal high should be 225 to 250 psi.
no of cylinders = 6 bore = 85 mm =8.5cmstroke = 90mm =9 cmbore area = bore * bore * pi/ 4 (pi=3.14159)volume of 1 cylinder = bore area * strokeengine capacity = volume of 1 cylinder * no of cylindersbore area = 8.5 * 8.5 * 3.14159/ 4=56.745 square cmvolume of 1 cylinder= bore area * storke=56.745*9=510.7 cubic cm (cc)engine capacity =volume of 1 cylinder * no of cylinders=510.7 * 6=3064.22 cc
This term is an equivalent of capacity; expressed for example in cubic meters of gas to second.
concrete and cementtarmacsmooth roadgood roadsfriction
To determine how many 80 lb. bags of concrete mix are needed to fill an oil drum, first calculate the volume of the drum. A standard oil drum has a capacity of about 55 gallons, which is approximately 0.2 cubic meters or 7.4 cubic feet. Since an 80 lb. bag of concrete mix typically covers about 0.6 cubic feet, you would need roughly 12 to 13 bags to fill the drum completely.
Essentially, excavator productivity is typically measured by the volume of loose or rock soils the machine can displace in a hour of continuous operation. Understand the formula for calculating excavator productivity. The formula is as follows: Q = (60*q*z*n*kf) / kl, where Q is the productivity of the excavator, q is the capacity of each rotor bucket in cubic feet, z is the number of buckets on the wheel and n is the speed of rotation of the rotor, measured in revolutions per minute. kf stands for the filling factor of a bucket while kl represents the soil-loosening factor. Gather the data. Typically, you can get the date for the capacity of each rotor bucket in cubic feet, the number of buckets on the wheel and the speed of rotation of the rotor from the operator's manual of your excavator, supplied by its manufacturer. The filling factor of the bucket and the soil-loosening factor can be determined experimentally. The filling factor, ranging from 0 to 1, determines the degree of the excavator bucket's utilization. For example, whether it is half-full or three-quarters-full determines the excavator bucket's utilization. To determine the soil loosening factor, which is always greater than 1, calculate by how much the density of the soil in the ground is greater than the density of the excavated soil. For example, if the soil loosens by 10 percent, the soil-loosening factor is 1.1. Use the formula from Step 1 to calculate excavator productivity. For instance, if the capacity of each rotor bucket is 10 cubic feet, the wheel has only one bucket, the rotor rotates at a speed of 5 rotations per minute, and the filling factor and the soil loosening factor are one, the productivity of the excavator stands at: Q = (60*q*z*n*kf) / kl = (60*10*1*5*1) / 1 = 3,000 cubic feet per hour. kf stands for the filling factor of a bucket while kl represents the soil-loosening factor.
7.34 cu yds.
That is not possible. A triangle is an area. Cubic meters belong to volume or capacity.
A 5-gallon bucket filled with water contains 0.668 cubic feet of water.
Capacity or volume of a cone = 1/3*pi*radius2*height measured in cubic units
You need to include the third dimension to calculate the cubic capacity of a room
Take the three dimensions. Length, width and depth. Multiply them together L x W x D This will give you the cubic capacity in the units uses. ie cubic feet, meters etc.
The capacity of a skid loader bucket can vary depending on its size and manufacturer. A typical skid loader bucket can hold anywhere from 11 to 22 cubic feet of sand, which translates to roughly 800 to 1600 pounds of sand.
You have to eat some hot-cheetos then poop them out and eat them again.
4 Cubic Yard Front-End Loader, 8 Cubic Yard Dump Truck, Hydraulic Excavator
To calculate capacity, you need the length, height, and width of your tank
There are 0.668 cubic feet in a 5 gallon bucket and 7.352 cubic feet in a 55 gallon drum.