answersLogoWhite

0

in special conditions

User Avatar

Wiki User

15y ago

What else can I help you with?

Continue Learning about Engineering

What are the 4 major section of gasTURBINE engine?

compressor, diffuser, combustion section and turbine


What are the Components of Project Proposal?

A project proposal typically includes several key components: an executive summary that outlines the project’s purpose and goals, a detailed project description that explains the approach and methodology, a timeline that outlines major milestones, and a budget that estimates costs and resources required. Additionally, it often contains a section on the project's significance, highlighting its impact and relevance. Lastly, a section on risk assessment may be included to address potential challenges and mitigation strategies.


What were some of the major technological advancements of the 1950s?

hydrogen bombtransistorized hearing aidsartificial satellitestransistorized computershybrid radios (vacuum tube RF section, transistorized audio - fully transistorized radio did not appear until the 1960s)muscle carsdiesel-electric locomotives replacing steam locomotivesjet airplanesetc.


Is TCS play a major role in Automation Sector?

TCS is a major IT industry in India.


What is socket programming in C?

There is nothing called "socket programming in C." Sockets can be programmed in any programming language. What follows below is a basic idea on how to program sockets. Socket programming refers to the use of a set of APIs for sending and receiving data over a network. The socket APIs originated on the BSD OS standardized by POSIX and are now found on UNIX, Linux, Windows, and Mac OS. The concept of a socket is an abstraction for an end point in network communication through which data can be sent to and received from. The major socket API functions are: * socket() -- creates a socket of specified type and protocol * bind() -- assigns a local name or address to the socket (in the IP protocol this is usually an IP address and port * connect() -- connects a socket to a remote end point * listen() -- changes the socket's state to listen for incoming connections * accept() -- accepts an incoming connection and returns a new socket for communication over that connection * send() -- send data to remote end point specified with connect() call * sendto() -- in connectionless protocols such as UDP, sends data to a specified remote end point * recv() -- receive data from remote end point (after connection established) * recvfrom() -- receive data from a specified remote end point in connectionless protocol * getsockopt() -- gets current value for a particular socket option * setsocketoption() -- set value of a particular socket option

Related Questions

In what major section of the contract is the time duration of the project normally specified?

The time duration of the project is typically specified in the "Schedule" or "Timeline" section of the contract. This section outlines the start and completion dates, key milestones, and any deadlines for deliverables. It may also include provisions for extensions or penalties for delays. Clear timeframes help ensure that all parties have a mutual understanding of project timelines and expectations.


What is the duration of Major Dundee?

The duration of Major Dundee is 2.05 hours.


What is the duration of Major Payne?

The duration of Major Payne is 1.58 hours.


What is the duration of Major manga?

The duration of Major - manga - is 2 hours.


What is the duration of Major Dad?

The duration of Major Dad is 1440.0 seconds.


What is the duration of Major Crimes?

The duration of Major Crimes is 2580.0 seconds.


What are the major activities of the Finance Administration Section?

The Incident Command System (ICS) is a tool used to improve emergency response. The major activities of the Finance and Administration section are contract negotiation and monitoring, timekeeping, cost analysis, compensation for damage to property or injury, and documentation for reimbursement.


What is the duration of Major Barbara film?

The duration of Major Barbara - film - is 2.18 hours.


What is the duration of Major League II?

The duration of Major League II is 1.75 hours.


What is the major section inside the library?

Personally the major section for me would be mystery


What is the duration of ESPN Major League Baseball?

The duration of ESPN Major League Baseball is 3 hours.


What is the duration of Major League Baseball on NBC?

The duration of Major League Baseball on NBC is 3 hours.