It could, but it should not crack. Either the grade was not prepared properly, the concrete was used too soon, the concrete was not reinforced, it was allowed to cure too quickly, or some other problem existed.

User Avatar

Wiki User

17y ago

What else can I help you with?

Continue Learning about Engineering

How should you repair ridges or bulges in newly poured concrete?

To repair ridges or bulges in newly poured concrete, first allow the concrete to cure for at least 24 to 48 hours. Once it has set, use a concrete grinder or a scarifier to level the surface, being careful not to damage the surrounding areas. After grinding, clean the surface thoroughly, then apply a concrete resurfacer to achieve a smooth finish. Finally, let the resurfacer cure according to the manufacturer's instructions.


What is the difference between reinforced concrete and pre stressed concrete?

Reinforced concrete has reinforcing bars (called rebar) simply embedded in the pour. With prestressed concrete, reinforcing rods or cables are stretched (stressed) and then the concrete is poured around them. After the concrete hardens, the tension on the reinforcing members compresses the concrete, making it more resistant to failure where poor soil conditions or severe loads exist.Prestressed construction is usually done in-plant because of the equipment involved, and the completed assembly shipped to the site for installation.A similar method, called post-tension, is usually done on site, and involves the tensioning of reinforcing cables after the slab is poured, using a special hydraulic jack.


How long after pouring concrete before sealing?

Typically, you should wait at least 28 days after pouring concrete before applying a sealant. This duration allows the concrete to cure properly and achieve its full strength. However, some sealers can be applied sooner, usually within 7 days, but it's essential to follow the manufacturer's recommendations for the specific product being used. Always ensure the surface is clean and dry before sealing.


What are the materials used to create a concrete block foundation?

A concrete block foundation is primarily made from Portland cement, water, and aggregates such as sand and gravel or crushed stone. The combination is mixed to form concrete, which is then poured into molds to create the blocks. Additional materials may include steel reinforcement bars for added strength and various additives to enhance durability and workability. These blocks are then cured to achieve optimal strength before being used in construction.


What is precast concrete panel?

A precast concrete panel is: A panel, tile, counter, Fin, wall etc that is usually poured in a controlled manufacturing facility (although it can be poured on site) into a mold of a specific shape. Whether it is mass produced or a custom shape the precast panel is usually finished (sealed) before installation (although, again this also can be done on site). There are 2 ways to istall concrete products: Pour on site or precast and install. There are many pros and cons for each process. Which method to use depends on what the customer/architect/designer/engineer is trying to accomplish.

Related Questions

Is it safe for me to drive on concrete after 5 days of it being poured?

It is generally safe to drive on concrete after 5 days of it being poured, but it is recommended to wait at least 7 days to allow it to fully cure and strengthen.


How should you repair ridges or bulges in newly poured concrete?

To repair ridges or bulges in newly poured concrete, first allow the concrete to cure for at least 24 to 48 hours. Once it has set, use a concrete grinder or a scarifier to level the surface, being careful not to damage the surrounding areas. After grinding, clean the surface thoroughly, then apply a concrete resurfacer to achieve a smooth finish. Finally, let the resurfacer cure according to the manufacturer's instructions.


Can plasma be poured?

actually a gas can be contained in a container, basicly being poured, so plasma can be poured. YES


How long should you wet a concrete sidewalk after being poured?

After pouring a concrete sidewalk, it is recommended to keep the surface wet for at least 5 to 7 days to ensure proper curing. This helps to prevent cracking and enhances the strength of the concrete. You can achieve this by misting the surface with water or covering it with wet burlap or plastic sheeting. Maintaining moisture is crucial during the initial curing period, especially in hot or windy conditions.


When can you paint new concrete?

Most manufacturers of concrete stains recommend that one waits approximately 90 days after the concrete is poured. Check the instructions on the can of stain and follow the instructions and time frames accordingly.


If gasoline poured into a tank an chemical change?

Gasoline being poured into a tank is not a chemical change.


What is diffusive?

DIFFUSIBILITY The quality of being diffusible; capability of being poured or spread out.


What is diffusability?

DIFFUSIBILITY The quality of being diffusible; capability of being poured or spread out.


What is diffuses?

DIFFUSIBILITY The quality of being diffusible; capability of being poured or spread out.


What is the difference between brick veneer and brick masonry?

Masonry implies bricks, blocks, or stones held together with mortar. Bricks are fired ceramic. Blocks are usually formed concrete. And stones are formed naturally and quarried from the earth. They are held together with mortar. Concrete is used as mortar, but concrete can also be poured to make slabs and foundations. I think the difference is that concrete can be used by itself without being considered masonry. For example, even statues can be made from concrete by pouring them into a mold.


What are some pictures of a liquid?

Pictures of liquids can include water flowing in a river, oil being poured from a bottle, a glass of milk being poured, or raindrops falling from the sky.


What is the advantages of strip foundation?

There are several advantages to strip foundation. They include being a proven method that the majority of builders know how to use it is easy for keeping the bricklayer occupied, it is fairly cheap, mistakes are too pricy to rectify after concrete has been poured, and services usually do not need immediate attention since they usually cross over the concrete.