answersLogoWhite

0

In the context of construction, a storeman is responsible for managing materials and supplies on-site. Key rules include ensuring accurate inventory management, maintaining safety protocols while handling materials, and keeping storage areas organized and compliant with regulations. Additionally, a storeman must track the usage of materials to prevent shortages or overstocking and communicate effectively with site managers and workers about material availability. Proper documentation and record-keeping are crucial for accountability and project efficiency.

User Avatar

AnswerBot

1mo ago

What else can I help you with?

Continue Learning about Engineering

What are the rules for constructing a program?

There are no rules that govern the construction of a program, other than those defined by the programming language we choose to use, which will naturally vary from one language to another.


What is semantic rules?

Semantic rules determine operations that associate expressions of the given language with their meanings. For Transparent Intensional Logic meanings are abstract procedures called "constructions", which are well-defined. Semantic rules - as seen from the TIL viewpoint - are instructions that make it possible to associate expressions with constructions. The result of a construction associated with an expression E - if any - is what Church calls "denotation" of E.


Choose the word that best completes this sentence. Per OSHA and acirc and 128 and 153s rules employers in the construction industry must provide required personal protective equipment at to workers.?

The best word to complete the sentence is "no cost." The sentence would read: "Per OSHA and acirc and 128 and 153s rules, employers in the construction industry must provide required personal protective equipment at no cost to workers." This emphasizes the responsibility of employers to ensure safety without passing on expenses to employees.


What does Ditto mean in construction?

what is ditto in construction


How the back pressure in a boiler calculated?

This question can't be answered. It is unclear what you mean by back pressure. Maximum Allowable Working Pressure in a boiler is calculated using the rules for construction of high pressure boilers and construction of heating boilers in the ASME Code sections 1 and 8.