CFT can stand for various things depending on the context, but commonly it refers to "Contract for Differences" in finance, a derivative trading instrument. In other contexts, it might refer to "Certified Flight Instructor" in aviation or "Common Fund for Commodities" in international trade. If you have a specific context in mind, please provide it for a more tailored explanation.
Steel Cannot be calculated based on cft. Load bearing capacity is required to calculate steel.
First assume the ratio of plaster is 1:4 (1 cement and 4 sand) now we have to plaster the wall having area of 100 sft assume the thickness of plaster 0.5 inches. first convert thickness in to feet so 0.5/12 = 0.0416 now to calculate the material use in cft so 100 sft x 0.0416 = 4.16 cft so we required 4.16 cft material to complete the plaster multiply it by dry factor 1.5 4.16 x 1.5 = 6.24 cft to calculate cement 6.24/(1+4) = 1.24 cft 1 cement bag volume 1.25 cft so calculate no of bags 1.24/1.25 = 1 bag to calculate sand (6.24/(1+4)) x 4 = 4.99 cft
i think 2
Weight of concrete is 155 lbs/cft or 70.308 kg/cum
1:6 brick work sand consumption for 1 cubic meter = 9.71 cft 1 cubic meter brick work cement consumption = 1.32 bags 1.32/28.8= .0458 cubic meter .458*6 = .275 .275*35.31 =9.71 cft
Complement-fixation Test
100 Cft
cft=kg
i cft of crush stone weight
The CFT full form of civil work is Complement Fixation Test.
One ton equal to how many cft
By unit of length and distance and conversion ,we can say that 1 cm =0.0328084 cft
1 cubic foot (cft) is equal to approximately 28.32 kilograms.
Complement Fixation Test is the full form of CFT. It is usually used in civil work.
12000
Ah, isn't that a lovely question? In one cubic foot (cft), there are 12 linear feet (rft). Isn't it wonderful how everything fits together so perfectly? Just like painting a happy little tree in just the right spot on the canvas.
Credit Funds Transfer