Spacing for floor joists is usually determined by building codes for the location

User Avatar

Neoma Donnelly

Lvl 10
2y ago

What else can I help you with?

Continue Learning about Engineering

Which floor joist system requires solid blocking or diagonal bridging?

The floor joist system that requires solid blocking or diagonal bridging is the conventional wood joist system. This system uses wooden joists spaced apart to support a floor, and solid blocking or diagonal bridging helps prevent lateral movement, adds stiffness, and distributes loads more evenly. This reinforcement is essential in maintaining structural integrity and minimizing vibrations in the flooring.


What is a crawl foundation in construction?

Instead of pouring a concrete slab for your floor you can have it built out of engineered i-joist. They do this by building concrete footings with a stem wall on top of that. They will then pour footings for pony walls or post and beams to support the i-joist's. They will then run the joist over the pony walls which will create your CRAWL SPACE. This also gives you the ability to fully insulate underneath the floor and have access to your plumbing if you run into problems with that later on. its also a little more forgiving when your children take those tumbles to the floor.


What type of hardwood floor can be laid on concrete heated floor?

An engineered hardwood floor can be floated or glued-down directly to the floor.Someone has changed the original question, or added it to this question, for what reason I have no clue.Question; Can you put underfloor heating under hardwood floorsYes, thousands of homes have radiant heat that runs in between the floor joist of a home.This is done underneath the floor and sub floor and if you where in the basement, when you look up between the floor joist, you would see the heat lines. This is accomplishedwith the use of a boiler. The lines do not throw off massive heat that would cause the hardwood floor to warp or buckle.


Beams transfer loads from the joist to the?

beam transfer loads from the joist to the wall or column where it supports..


How do you determine the fall of a pipe?

Generally with a level. 1/8 inch to the foot. If you have a known level such as the top of the foundation, you could measure from the floor joist and be close enough. For long distances, a surveying transit is used.

Related Questions

How far should boards be for subflooring?

Standard wood floor joist spacing is 16" on center.


Does a joist note giving size spacing and direction and shown on a floor plan pertain to the framing above or below?

A joist note on a first floor plan would refer to the Joist below that floor, a joist note on the third floor plan woud be for that floor.


What information can I find in the 2x6 floor joist span chart?

The 2x6 floor joist span chart provides information on how far 2x6 floor joists can span without additional support, based on factors like the type of wood and the spacing between the joists.


What is the recommended deck joist spacing for a 24-inch deck?

The recommended deck joist spacing for a 24-inch deck is typically 16 inches on center.


What is the recommended joist spacing for a deck to ensure structural integrity and safety?

The recommended joist spacing for a deck is typically 16 inches on center to ensure structural integrity and safety.


Does floor joist height increase with length of joist?

Not really. All joists will be the same whether you are working on a 1st or second floor, so your floor does not have a bunch of different levels. Usually we use 2 x 12 lumber, doubling joists which have walls above them or decreasing the spacing if you are at the limits of the span. example you have a 22' span in a garage with living area above it, you would use 2 x 12 with 12" on center spacing.


What is the maximum joist spacing for decking?

The joist spacing required for composite decking will depend on: * the strength of the particular composite decking material chosen * the dimesions of the composite decking material


How much weight can you put on a floor joist?

it depen on the size of the joist


How can I replace a floor joist?

Replacing a floor joist involves removing the damaged joist, measuring and cutting a new joist to fit, and then installing the new joist in place of the old one. It is important to provide proper support for the surrounding structure during the replacement process to ensure the stability and safety of the floor. It is recommended to consult with a professional contractor or structural engineer for guidance and assistance in replacing a floor joist.


What can you span with a 2x4?

That depends upon its use, snow load if rafter - location As a ceiling joist/floor joist only around 6' depending upon species of wood & grade Also depends upon spacing, 12" 16" or 24" OC


How far can a deck joist overhang the girder it rests on?

It depends on the joist thickess, spacing and load it is carrying. There is not a answer without more information.


What is the spacing on rafters in a mobile home?

Typical construction layout for mobile home floor joists is 24'' on center. Some older models may be laid out 48'' on center depending on type and size of floor joist used.Ans 2 - MOST mobile homes made since 1975 have 16" spacing of floor joists. Mine and many others I've seen are 16" spacing. -I've looked at and re-floored many.My ceiling rafters are also 16" spacing. - Never seen 24" spacing.