if we do-not plan a program then we are not able to know that what to do next
warming oven ... only on a fancy floor plan!
the engeneer do is an .....will plan in what kind of building he make....then the engeneer do is an....will plan what is the place will make a road?
An effective development plan should factor in the effects on the environment and how some of them can be reduced. For example, a mine shaft should have a plan for rehabilitation after it is depleted.
Floor plan mean Scottish plan. It shows the distance of room from the floor and physical appearance of room walls and all other features of rooms.
plan-arian plan-less plan-tain plan-ter plan-isphere
the awesome plan - der tolle Plan an awesome plan - ein toller Plan awesome plan - toller Plan
The future tense of the verb "plan" is "will plan".
A single plan is a plan
The plan is to remember his plan and tell other of his plan
It is a strategic plan
How to transfer business plan to an action plan
Not exactly…a master plan is the main plan to follow.
The past tense of plan is planned; the future tense is will plan.
An operational plan is a permanence plan or a repeated work but an action plan is a plan used to take action on a new problem.
Define which plan "this plan" is.
You can only plan IN the present but you can plan FOR the future.