There are a large number of soil tests related to construction:

  • Particle Size Distribution test - finds the relative proportions of differing grain sizes within a soil
  • Atterberg Limit test - used to establish the plasticity class of the soil
  • Compaction test - used to find the optimum moisture content to achieve a maximum density
  • Consolidation / Oedometer testing - used to establish the settlement potential of a fine grained soil.
  • Direct Shear test - used to measure the peak (and potentially residual) shear strengths of a soil. When tested at varying confining loads can be used to find the shear strength parameters Phi' and c'*
  • Triaxial testing - used to find the elastic properties of the soil (Young's Modulus and Poisson's Ratio) along with the shear strength. These may be either drained or undrained tests.
  • Constant and falling head permeability tests - used to establish the hydraulic conductivity / coefficient of permeability for coarse and fine grained soils respectively.

*Note in the UK c' is assumed to be zero for design purposes, in other countries small non zero c' may be used.

User Avatar

Wiki User

13y ago

What else can I help you with?

Continue Learning about Engineering

What soil type would be best for building a structure?

The best soil type for building a structure is typically sandy or gravelly soil, as these have good drainage properties and provide stable support. They are less prone to shifting or settling compared to clay soils, which can expand and contract with moisture changes. Additionally, well-compacted soil increases stability, making it ideal for construction. Always consider conducting a soil test to assess the specific conditions before building.


Find Soil Engineer?

form_title=Find Soil Engineer form_header=8383 Please state the reasons you are needing a soil engineer. (Select all that apply)*= [] "Septic tank ""perk test"" [] Soil analysis for real estate transaction [] To apply for building permit [] Construction recommendations [] Drainage recommendations [] Repair/mitigation recommendations [] Maintenance recommendations [] Check specific soil conditions [] Expert testimony for litigation [] Other" Explain what sort of project this is.*= () "New Construction () Remodel () Addition to existing structure () Building repair () Building inspection () Foundation, slab-on-grade or piling () Pavement () Retaining wall () Drainage system () Septic system () Slope () Other"


What is construction?

Construction is the building of almost anything. It is the process of creating and building infrastructure or a facility.


What is soling activity in construction?

Soiling activity in construction refers to the process of preparing and modifying the soil to ensure it is suitable for building foundations and other structural elements. This involves various techniques such as soil excavation, compaction, and stabilization to enhance soil properties like load-bearing capacity and drainage. Proper soiling is crucial for the longevity and safety of a construction project, as it directly affects the stability of structures. Additionally, it often includes managing soil erosion and ensuring compliance with environmental regulations.


Why CBR mould soaking during soil test?

to test soil in its worst state

Related Questions

Do you need a soil boring to test your soils before building a house foundation?

Yes, the related cost to getting a soil boring test is pretty minimal compared to the possible problems that could arise during construction and compared to the overall construction costs of your house/building.


What soil type would be best for building a structure?

The best soil type for building a structure is typically sandy or gravelly soil, as these have good drainage properties and provide stable support. They are less prone to shifting or settling compared to clay soils, which can expand and contract with moisture changes. Additionally, well-compacted soil increases stability, making it ideal for construction. Always consider conducting a soil test to assess the specific conditions before building.


What has the author Edwin Leroy Hansen written?

Edwin Leroy Hansen has written: 'The Suitability of stabilized soil for building construction' -- subject- s -: Building materials, Soil mechanics


Why soil survey should be carried out before construction takes place?

The surveys should take place before the construction to know that whether the soil is hard enough or stable enough to take the load of construction. This survey is important so that the house or the building do not sink in.


Find Soil Engineer?

form_title=Find Soil Engineer form_header=8383 Please state the reasons you are needing a soil engineer. (Select all that apply)*= [] "Septic tank ""perk test"" [] Soil analysis for real estate transaction [] To apply for building permit [] Construction recommendations [] Drainage recommendations [] Repair/mitigation recommendations [] Maintenance recommendations [] Check specific soil conditions [] Expert testimony for litigation [] Other" Explain what sort of project this is.*= () "New Construction () Remodel () Addition to existing structure () Building repair () Building inspection () Foundation, slab-on-grade or piling () Pavement () Retaining wall () Drainage system () Septic system () Slope () Other"


How is soil used as a construction material?

in a clay type soil adobe houses are made in the southwest.soil is used to back fill a foundation wall --- soil is used as a base for slate walkways-- and for gardens we plant around our houses


What does a MAP engineer do?

A map engineer determines the topographic map of construction site so the volume of soil that should be carried to out site or be brought from out site can be computed. Moreover, he determines borders of the building and important points in the building with the start of construction.


What is a soil compaction test?

A soil compaction test is a method used to determine the density of soil and assess its ability to support structures or vegetation. It involves applying pressure to the soil sample in a standardized way to measure its compaction characteristics, which helps in optimizing construction processes and ensuring stable foundations.


Why do you remove top soil when you want to construct a building?

Top soil is removed during construction to provide a stable foundation for the building. It helps prevent settling and shifting of the structure over time. Additionally, top soil contains organic matter that can decompose and cause uneven settling of the building.


Why does construction contributes to soil erosion?

Construction activities, such as clearing land, grading, and digging, can expose soil to erosion by removing vegetation that helps hold soil in place. Additionally, construction can compact soil, making it less able to absorb water and more prone to erosion. Finally, the disruption of natural drainage patterns and increased runoff from impermeable surfaces can also contribute to soil erosion.


Why subsoil facctors can affect new and other construction project?

Subsoil factors, such as soil composition and water table level, can impact the stability and foundation of a new construction project. Different soil types have varying load-bearing capacities, which can affect the structural integrity of the building. Additionally, factors like soil settlement or expansive soils can cause issues with the long-term durability of the construction. Understanding and addressing subsoil factors is crucial to ensuring the safety and longevity of the building.


Field soil density test?

The in-situ density of the soil is required to control the results of field compaction in earth embankments, Road fill and structural back filling. So, measuring the soil density is essential before building any construction. Three methods are used to determine the density (unit weight) of a soil in the sight; the sand replacement method, the balloon method, and the nuclear method.