It is the grade of concrete which indicates the strength of concrete after 28 days curing. M #) means the strength of concrete after 28 days of curing will be 30 N/mm2 .
stress in old concrete
Concretes from grade M-60 to M-80 are called as high strength concretes as per IS 456-2000
In this M refer to Maximum compressive strength and 20 refer that concrete that with stand upto 20KN compressive strength.
The weight of a concrete slab can be calculated using the formula: weight = volume × density. For a 900 x 600 mm slab with a typical thickness of 100 mm, the volume is 0.9 m × 0.6 m × 0.1 m = 0.054 m³. Given that the density of concrete is approximately 2,400 kg/m³, the weight would be about 129.6 kg (0.054 m³ × 2,400 kg/m³).
Concrete is generally heavier than both sand and gravel. The density of concrete typically ranges from 2,200 to 2,500 kg/m³, while sand has a density of about 1,600 to 2,000 kg/m³ and gravel usually falls between 1,500 to 2,000 kg/m³. Therefore, when comparing equal volumes, concrete will weigh the most.
The equivalent concrete for M-30 cylinder strength is M-40 cube strength
m-30
1:1:2
Density of M30 and any fresh concrete is 2400kg/cu.m and reinforced concrete density you can take 2500 kg/cu.m
What is mixing ratio for concrete grade 30
30 - 2 = 28 .25 - 2 = 23 .28 * 23 = 644Answer The area covered by grass is 644 square meters
M. D. A. Thomas has written: 'Durability of pfa concrete' -- subject(s): Concrete, Testing, Concrete construction
L. M. James has written: 'Concrete technology' -- subject(s): Concrete
Seven days strength of any concrete usually comes 67% of 28 day strength. So 7 day strength of M30 may be .67*30=20.10 MPa
stress in old concrete
m 35 is the high constituents of concrete
L. M. Poukhonto has written: 'Durability of concrete structures and constructions' -- subject(s): Concrete, Deterioration, Reinforced concrete construction, Testing