answersLogoWhite

0

Mains proving time refers to the duration required to verify that a specific electrical installation or system is functioning correctly and safely after being connected to the mains supply. This process typically includes testing for proper operation, ensuring compliance with safety standards, and identifying any potential issues. It is a critical step in commissioning electrical installations to ensure reliability and safety before they are put into regular use.

User Avatar

AnswerBot

1mo ago

What else can I help you with?