answersLogoWhite

0

providing mission essential power

User Avatar

Wiki User

15y ago

What else can I help you with?

Continue Learning about Engineering

When working on an existing electrical system what should the first test to be carried out be?

When working on an existing electrical system, the first test to be carried out should be a visual inspection, followed by verifying the system's de-energization using a suitable voltage tester. This ensures that the system is safe to work on and identifies any obvious signs of damage, wear, or incorrect installations. After confirming de-energization, further tests such as insulation resistance and continuity testing can be conducted to assess the system's integrity.


How can you connect single phase generator in three phase supply system in house lighting system?

First house lighting systems are single phase not three phase. To connect a generator to the house lighting system for emergency power, it would take an electrician to do the job properly. The biggest concern would be to isolate the rest of the service from the main distribution supply service and then isolate the rest of the distribution panel loads from the lighting loads.


Who invented electrical air conditioning?

The first electrical air conditioner was invented by Willis Haviland Carrier in 1902.


What is importance of number system in computer?

Ever since the first modern computer was invented, built and run they have only been able to work with a system of electrical flow or no electricity. This understood by computers as zero or one. to build a workable computer system is building on this Binary (0/1) system. The first computers worked in data sizes of a nibble (0101) but latter switched to a Byte (10101010). Computers can only run by the numbers as long as those numbers are 0 or 1


Who opend a power plat that used AC power in 1895?

In 1895, the first large-scale power plant using alternating current (AC) was opened by the Westinghouse Electric Company, led by George Westinghouse. This facility was built at Niagara Falls and marked a significant advancement in electrical engineering, enabling the transmission of electricity over long distances. The success of this plant helped establish AC as the dominant form of electrical power distribution.

Related Questions

Can you install and run Microsoft Word on your computer without first installing an operating system?

No. You need an operating system to do the installing.


What is the incomer of a DB?

The "incomer" of a DB typically refers to the main electrical supply line entering a distribution board or electrical panel. This is where the power from the utility company or generator first enters the building's electrical system before being distributed to various circuits.


What was Nikola Tesla's contribution to the study of electricity?

Tesla provided the first practical Alternating-Current AC system of generator/transformer/motor for the distribution of electrical power on an industrial scale.


What is the first step that should be taken when installing a computer component?

you should unplug the system


How electrical power is transmitted from power plan to the consumer?

electrical power from the power plant to consumer goes through the transmission & distribution system, first we transmit the high voltage power from the power plant to sub station in sub station we step down the voltage according to need & distribute it to the demand.


How much voltage in phase to phase?

First of all, the correct term is 'line to line', not'phase to phase'. The line to line voltage is called a line voltage, and its value depends on the electrical standards in your country, and the point in the electrical tranmission/distribution system where it is measured. In the UK, for example, its value could be between 400 kV (high-voltage transmission line) and 400 V (low-voltage distribution line).


Your home ac is not cooling?

First check to make sure that the system has freon, if not then you will have a leak then check the electrical system................


What year did Toyota 4runners first come equipped with latch system?

According to a Toyota, they began installing the LATCH system in the 4Runner beginning with the 2003 model.


How can I safely and effectively add a 100 amp subpanel to my existing electrical system?

To safely and effectively add a 100 amp subpanel to your existing electrical system, you should first consult with a licensed electrician to ensure compliance with local building codes. The process typically involves installing a new circuit breaker in the main panel, running appropriate gauge wires to the subpanel, and properly grounding the subpanel. It is important to follow all safety precautions and guidelines to prevent electrical hazards.


When installing a service pack or security patches on an operating system what should be done to protect the system in the event of a faulty or aborted installation?

Set a restore point first


What electrical word starts with the letter t?

Transformer is an electrical word that starts with the letter "t." Transformers are devices used to change the voltage of electricity for transmission and distribution.


When was the automatic switching system invented?

The first automatic switching system was introduced at the 1881 Paris Electrical Exposition, and a workable system had been patented by 1889.