Mix equal amount of CSS-1 emulsified asphalt with water at 30 degrees Celsius and after 15 minutes spray at 0.2 l/m2 at the surface prepared.
give me a blowjob then i will tell u the answer.
The main asphalt paving product is hot mix asphalt, in which asphalt cement is used to bind a mixture of stone, sand, and gravel.
Hot mix asphalt is is heated for application, which thins the material. Remember those steaming metal buckets you used to see on industrial rooftops? Cold asphalt is liquified with something else besides heat. There are two kinds: Emulsified asphalt is mixed with water and an emulsifying agent. Think of it like salad dressing that does not separate in the bottle. The other kind is called Cutback asphalt and is mixed with a petroleum solvent such as naptha, gasoline, or kerosene. They both are liquids at ambient temperature when applied; then the solvent or water evaporates, leaving the asphalt behind. Look up at asphaltinstitute.org
Between 250 and 280 is typical for hot mix.
1:4:8
Cold Mix Asphalt is a mixture of aggregate and asphalt. Cutback asphalt is a liquid asphalt. Cold Mix Asphalt is a mixture of Aggregate and Asphalt. The Asphalt is usually am emulsion asphalt or a cutback asphalt. An emulsion asphalt is asphalt cement blended with water. Cutback asphalt is asphalt cement blended with a fuel oil, kerosene, or a naptha. The water, fuel oil, kerosene or Naphta evaporates and leaves the asphalt.
give me a blowjob then i will tell u the answer.
hand crank
The main asphalt paving product is hot mix asphalt, in which asphalt cement is used to bind a mixture of stone, sand, and gravel.
What's your application? If you're paving a road with very little traffic, a driveway, or just doing patching, you can use cold mix. However, when it come to major roadways with high levels of traffic, it's universally going to be hot mix.
Hot mix asphalt is is heated for application, which thins the material. Remember those steaming metal buckets you used to see on industrial rooftops? Cold asphalt is liquified with something else besides heat. There are two kinds: Emulsified asphalt is mixed with water and an emulsifying agent. Think of it like salad dressing that does not separate in the bottle. The other kind is called Cutback asphalt and is mixed with a petroleum solvent such as naptha, gasoline, or kerosene. They both are liquids at ambient temperature when applied; then the solvent or water evaporates, leaving the asphalt behind. Look up at asphaltinstitute.org
The cost of cold mix asphalt can vary depending on factors such as quality, quantity, and location. On average, prices can range from $50 to $100 per ton. It's recommended to get quotes from different suppliers in your area to find the most competitive price.
No, kerosene is not recommended to be mixed with asphalt. It can degrade the asphalt binder, affecting the overall performance and durability of the asphalt mixture. It is important to use recommended additives and mixtures for asphalt to maintain its quality.
To mix 1 cubic meter of asphalt concrete, start by combining aggregate (such as crushed stone or gravel), asphalt binder, and any necessary additives in a hot mix plant. The aggregates should be heated to around 150-180°C (300-350°F) to ensure proper adhesion with the binder. Once the aggregates are heated, add the asphalt binder at the appropriate temperature and mix thoroughly until a uniform consistency is achieved. Finally, the asphalt concrete can be transported to the paving site for application.
Between 250 and 280 is typical for hot mix.
:.5:.3
1:4:8