answersLogoWhite

0

Engine room or space fitted with sensors and controls for monitoring and responding to machinery operating conditions. This makes it unnecessary for personnel to be present in the space at all times

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Engineering

What is the procedure for putting engine room in an unmanned condition?

To put the engine room in an unmanned condition, the following procedure is typically followed: First, ensure all machinery is operating normally and that all safety checks are completed. Next, secure the engine room by shutting down non-essential equipment and isolating fuel and oil systems. Finally, activate the remote monitoring systems and alarms, ensuring that emergency protocols are in place for any potential issues that may arise while the engine room is unmanned.


What is the machinery used for translation?

Ribosome


What does a production operator do?

Generally operate machinery on a production line. It's a generic term covering a wide range of machinery and products.


What is your participation in the dismantling of auxiliary machinery?

I never did that.


What is the proper five step USAF return to service sequence for lockout tagout?

1. Check the Area: Check the work area to ensure that all personnel are clear of the machinery and equipment.2. Check the Machine: Check the machinery and equipment to ensure that everything is properly assembled, all nonessential items are removed, and the machinery and equipment is ready for safe operation.3. Verify: Verify that switches and controls on the machinery and equipment are in the OFF position, are properly aligned, or are in the neutral position.4. Notify: Notify the affected worker(s) of the return-to-service procedure. If there is a question about who the affected workers are, the authorized worker shall notify the machinery and equipment owner/operator.5. Return: After the affected persons have been notified,- notify the machinery and equipment owner/operator of intent to re-energize;- obtain authorization to re-energize from the machinery and equipment owner, if required;- remove the lock and tag from the energy-isolating device;- re-energize and test the machinery and equipment or coordinate testing with the machinery and equipment owner/operator to ensure that the machinery and equipment can be operated safely (if independent verification is required, that task would be completed at this point in the process); and- return the machinery and equipment to "ready for duty" status.

Related Questions