answersLogoWhite

0

What else can I help you with?

Continue Learning about Engineering

How much concrete can be made using one bag of cement?

Concrete strength is measured by "bag mix", meaning that the bag mix answers the question, how many bags of cement per yard of concrete. If you're looking for a "6 bag" mix, that means 6 bags of cement per yard of concrete. A "bag" of cement is 1 cubic foot. A yard of concrete is 27 cubic feet (3 X 3 X 3 = 27). If you want to make a "6 bag mix" of concrete, using 1 bag of cement, you would make 1/6 yard concrete with 1 bag of cement. If you would be content with a "5 bag mix", you could make 1/5 yard. Concrete is often defined as ratios of cement,sand,aggregate such as: 1:2:3 which is a very common mix. For a 1:2:3 mix you would need 1/6th of the volume to be cement. The dry ingredients are generally 1.6 x finished concrete volume. Therefore dry volumen for 1 cubic yard = 1.6 cu yards = 43.2 cu ft. 1/6 x 43.2 = 7.2cu ft. Therefore, if one bag is 1 cu ft we need 7.2 bags for a healthy 1:2:3 mix. A '6 bag mix' or a '5 bag mix' are a bit short on cement.


A six sack of concrete mix has how much cement in it?

The answer is, remarkably, 6. Answer: "6 sack" or "6 bag mix" has six bags of cement per cubic yard of concrete mix. Since each sack/bag contains 94 lbs of dry cement, this equals 564 lbs of cement per cubic yard of concrete.


What is ultimate 28 day concrete strength?

The strength of concrete on the 28th day is considered full strength with regard to the engineering calculations for its use. Concrete continues to get hard for 100 years or more, as long as it has water on it now and then. For a 6-sack concrete mix, its 28 day compressive strength should be at 4,000 psi or greater.


What is the strength of concrete after 28 days?

The compressive strength of M25 concrete at 7 days will be between 6-7.5 N/mm2 .


Mix design for m 10 concrete?

Mix ratio for M10 concrete is 1:3:6compressive strength is 10N/mm2 @ 28 days.1 part of cement, 3 part of sand, 6 parts of coarse aggregate.

Related Questions

How much concrete can be made using one bag of cement?

Concrete strength is measured by "bag mix", meaning that the bag mix answers the question, how many bags of cement per yard of concrete. If you're looking for a "6 bag" mix, that means 6 bags of cement per yard of concrete. A "bag" of cement is 1 cubic foot. A yard of concrete is 27 cubic feet (3 X 3 X 3 = 27). If you want to make a "6 bag mix" of concrete, using 1 bag of cement, you would make 1/6 yard concrete with 1 bag of cement. If you would be content with a "5 bag mix", you could make 1/5 yard. Concrete is often defined as ratios of cement,sand,aggregate such as: 1:2:3 which is a very common mix. For a 1:2:3 mix you would need 1/6th of the volume to be cement. The dry ingredients are generally 1.6 x finished concrete volume. Therefore dry volumen for 1 cubic yard = 1.6 cu yards = 43.2 cu ft. 1/6 x 43.2 = 7.2cu ft. Therefore, if one bag is 1 cu ft we need 7.2 bags for a healthy 1:2:3 mix. A '6 bag mix' or a '5 bag mix' are a bit short on cement.


A six sack of concrete mix has how much cement in it?

The answer is, remarkably, 6. Answer: "6 sack" or "6 bag mix" has six bags of cement per cubic yard of concrete mix. Since each sack/bag contains 94 lbs of dry cement, this equals 564 lbs of cement per cubic yard of concrete.


What is ultimate 28 day concrete strength?

The strength of concrete on the 28th day is considered full strength with regard to the engineering calculations for its use. Concrete continues to get hard for 100 years or more, as long as it has water on it now and then. For a 6-sack concrete mix, its 28 day compressive strength should be at 4,000 psi or greater.


What is the strength of concrete after 28 days?

The compressive strength of M25 concrete at 7 days will be between 6-7.5 N/mm2 .


Mix design for m 10 concrete?

Mix ratio for M10 concrete is 1:3:6compressive strength is 10N/mm2 @ 28 days.1 part of cement, 3 part of sand, 6 parts of coarse aggregate.


How many bags of readymix will 1 bag of portland?

5 or 6. An 80 lb. bag of ready mix concrete will make about 1/2 cubic foot of concrete. A 94 lb. bag of portland cement mixed with 1 1/2 cu. ft of stone (coarse gravel) and 1 cu. ft. of sand will make 3 cubic feet of concrete or 6 times as much. (this is a common 1:2:3 mix) Quikcrete ready mix is often made with 1 part cement, and 2 1/2 parts each sand and stone. A 1:1 1/2: 3 mix is a stronger mix but you get less volume, at 5 1/2 cubic feet per bag of cement.


What is the psi of 6 sack concrete mix?

4500


What is the tensile strength of concrete?

4.2x10^6 iirc


How many kg of cement for 1m3 concrete?

there are 108 20kg bags of concrete to 1 cu mtr. If your making your own mix using dry mix concrete requiring cement and water, and your making a mix ratio of 5:1, then you divide 108 by 6 = 18. therefore: 18x20kg bags of cement to 1800kgs of dry concrete mix.


How many bags of cement in a cubic meter?

For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum


How many bags of pre-mix cement is needed to mix 1 cubic yds?

Cement comes in bags that weigh 94 lbs. The volume of the bag is approximately 1 cubic foot. If you want to mix concrete which is a mixture of a coarse aggregate (gravel) and a fine aggregate (sand) and something to bond the two aggregates together (cement) then firstly you need to know the strength concrete that you require. For 1 cubic yard of 3000psi (pounds per square inch) strength you will need about 6 bags cement 12 cubic feet of sand and 24 cubic feet of gravel. Rule of thumb is the ratio should be 1:2:4 (cement:sand:gravel)


How many bag of mix do you need to do 6 foot by 6 foot 4 inch slab?

48