answersLogoWhite

0

During which phase of DMAIC will you identify the root cause of the problem?

User Avatar

Taya Kuphal

Lvl 10
2y ago

What else can I help you with?

Continue Learning about Engineering

Which phase of dmaic identify root of problem?

During which phase of DMAIC will you identify the root cause of the problem?


What phase is the easiest to identify and why?

yes


Is cause and effect diagram considered both planning and control mechanism?

Yes, a cause and effect diagram, often referred to as a fishbone diagram, serves as both a planning and control mechanism. In the planning phase, it helps identify potential causes of problems, facilitating proactive strategies to address them. During the control phase, it aids in monitoring and managing processes by clarifying relationships between causes and effects, which can guide corrective actions when issues arise. This dual functionality makes it valuable in quality management and problem-solving efforts.


If the cost of fixing a defect in the requirements phase is 1 what is the relative cost of fixing a defect in the Testing Phase?

It is safe to estimate that the cost of fixing a problem increases by roughly an order of magnitude in each phase of development.requirements phase (cost 1)preliminary design phase (cost 10)detailed design phase (cost 100)coding phase (cost 1000)testing phase (cost 10000)So as an estimate if a problem is not found until test phase it will cost roughly 10000 times as much to fix as it would if the problem had been found in the requirements phase.


How do you balance the unbalanced load in 3 phase?

If the load is connected in wye (star) and it has a neutral, then the vectorial-difference of the phase currents will flow in the neutral and there will be no problem. On the other hand, if there is no neutral, then an unbalanced load would cause unbalanced phase voltages.

Related Questions

What phase of DMAIC will identify the root cause of the problem?

In the analyze phase of DMAIC you are able to identify the root cause of the problem.


What phase of the DMAIC will identify the root cause of the problem?

In the analyze phase of DMAIC you are able to identify the root cause of the problem.


What phase of DMAIC will you identify the root cause of the problem?

In the analyze phase of DMAIC you are able to identify the root cause of the problem.


Which phase of dmaic will you identify the root of the problem?

During which phase of DMAIC will you identify the root cause of the problem?


What phase of DMAIC will you identify the root of the problem?

In the analyze phase of DMAIC you are able to identify the root cause of the problem.


Which phase of DMAIC will you identify the root causes of the problem?

During which phase of DMAIC will you identify the root cause of the problem?


During which phase of DMAIC will you identify the root causes of the problem?

During which phase of DMAIC will you identify the root cause of the problem?


During which phase of the DMAIC will you identify the root causes of the problem?

During which phase of DMAIC will you identify the root cause of the problem?


What phase of DMAIC will you identify the root causes of the problem?

In the analyze phase of DMAIC you are able to identify the root cause of the problem.


What phase of the dmaic will you identify the root causes of the problem?

In the analyze phase of DMAIC you are able to identify the root cause of the problem.


Which phase of dmaic identify root of problem?

During which phase of DMAIC will you identify the root cause of the problem?


What is the purpose or goal of the Analyze phase in the DMAIC process?

The purpose of the Analyze phase is to find out the root cause of the problem we are trying to address