A different switch is needed for an inductive load because inductive loads, such as motors and Transformers, generate back EMF (electromotive force) when the current is interrupted. This back EMF can cause voltage spikes that may damage standard switches or cause arcing at the contacts when the load is turned off. Specialized switches, such as contactors or relay switches designed for inductive loads, can handle these voltage spikes and provide a safer and more reliable operation. Additionally, they often have features like built-in transient suppression to protect against these effects.

User Avatar

AnswerBot

1mo ago

What else can I help you with?

Continue Learning about Engineering

What materials will you need to make a parallel circuit?

Lightbulb(load),Battery(Power source),Switch,Copper wire


Can a 400 kw generator handle a 460 kw load?

Since the breaker that is installed on the generator set will be sized to the output of the 30 kW generator, the load will stay connected until the thermal trip of the breaker trips the load off line. This will be in the matter of seconds before it happens. To handle a 75 kW load and depending if it is an inductive or a resistive load you will need at least a 80 to 100 kW generator.


What three things are needed to make a complete electrical circuit?

The first part is that you need a power source. The second thing is that you need a load. The third thing is that you need the power cables.


What is spsn load-break switch?

An SPSN load-break switch is a type of electrical switch designed to safely interrupt the flow of electricity in a circuit while under load. It is commonly used in medium voltage applications, providing a means to isolate electrical equipment for maintenance or repair without the need to de-energize the entire system. The switch allows for safe operation by facilitating controlled switching and minimizing electrical arcing. Its robust design ensures reliability and safety in various industrial and utility settings.


How calculate for 33A mcb is for?

To determine the appropriate application for a 33A miniature circuit breaker (MCB), you first need to consider the load it will protect. The MCB rating indicates it can handle a maximum continuous current of 33 amperes. To calculate the total load, sum the amperage of all devices connected to the circuit and ensure it does not exceed the MCB rating, ideally allowing for a safety margin. Additionally, consider the type of load (resistive, inductive) and the circuit's overall design to ensure compatibility with the 33A rating.

Related Questions

Do you need a switch to control each load in a parallel circuit?

Yes.


How do I tell if I need to switch to multi-wan load balancing?

You should switch if there is a Failover Script for Dual. You can read more at blog.taragana.com/.../how-to-load-balancing-failover-with-dual-multi-wan-adsl-cable-connections-on-linux.


Is there a device that will enable or energize when a voltage range of 20V to 110V is applied that can be used to connect a shower fan to the dimmer switch and activate the fan when the light is on?

Need more info to give you the most usefull answer. However, generically speaking, sounds like what you need is a 120v relay. Put the relay output contacts in series with the fan (aka the load) then wire the relay coil in parallel to the light bulb power. This will make the load come on when the light is powered on. Tip, if the fan is driven by an induction motor (most are, if it has brushes it is NOT an induction motor) then your speed controller will have to be the kind for an inductive load ( NOT the kind for a resistive load, like a lightbulb ). Good luck.AnswerA solid state relay, or SSR should do it for you. SSRs take a broad range of input voltage as you require, and have snubbers to allow them to switch inductive loads such as the fan.


What materials will you need to make a parallel circuit?

Lightbulb(load),Battery(Power source),Switch,Copper wire


Why is there a need for different building foundations?

According to soil condition, load, environmental conditions we need different types of foundations.......


Can a 400 kw generator handle a 460 kw load?

Since the breaker that is installed on the generator set will be sized to the output of the 30 kW generator, the load will stay connected until the thermal trip of the breaker trips the load off line. This will be in the matter of seconds before it happens. To handle a 75 kW load and depending if it is an inductive or a resistive load you will need at least a 80 to 100 kW generator.


How do you load a BB gun?

Each model is different. You need to state the model to get an answer.


What is an electrical load and how it can be measure?

Typically you are referring to a pure resistive load and not an inductive load. To measure a resistive load you need an Ohm meter. You can buy cheap ones for $10 to $20 on-line or at a store like Radio Shack. Usually they are combined with a volt meter.


How much full load ampere in 2 horse power compressor?

It depends on the voltage of the compressor. Two horse power (electric) is 1492 watts, but watts are volts times amps, so you need to know the voltage. Since the motor is an inductive load, you will also need to know the power factor, so as to compensate for true vs apparent power.


How do you hook up a toggle switch for strobe lights in a 1993 Honda civic?

The way I hooked up the strobe lights in my truck, i did the following: [need a switch that has (+)(load)(-). Three prongs..] -run a wire from positive(+) of the battery to the positive(+) of the switch. -run a negative(-) from the battery to the negative(-) of the switch. -run the positive of the strobe to the (load) of the switch. -either run a negative(-) wire from the strobe to the switch, or mount it to the vehicle body somewhere.. Hope this helps.. Good luck


What three things are needed to make a complete electrical circuit?

The first part is that you need a power source. The second thing is that you need a load. The third thing is that you need the power cables.


How do you wire a 3 way switch?

You will actually need 2 3-way switches to control something from two locations. The first switch will receive the power, while the other will go directly to the load being controlled. The switch getting power will have the hot lead connected to the common terminal. The other switch will have its common terminal connected to the hot lead going to the load. Two "travellers" will be connected between the other terminals on the switches. They will be connected switch-to-switch. And don't forget that your neutral coming from the power feed will be connected to the load. Also don't forget to connect ground wires.