is it a footer that is poured the same time as the slab?
If there are no seams in it - it was not poured in sections, but as one continuous pour.
because of the water
amun
Slab 15mm
is it a footer that is poured the same time as the slab?
monolithic slab
If there are no seams in it - it was not poured in sections, but as one continuous pour.
If you go to the monolithic dome site you will be able to check the size of footers for the over all size of your dome. Rev.Dick Freeman domeman3@earthlink.net
A pour of concrete, all at a single time. Also called a one-pour system. Contrast with two-pour system. At the same time you pour the floor, you are going to pour the perimeter footings. This is called a monolithic pour (or monolithic slab).
To determine if you have a monolithic foundation, check for a concrete slab that is poured all at once, typically encompassing the footing and foundation walls. Look for a flat, continuous surface without visible seams or separate footings. Additionally, you can inspect the structure's exterior; if the foundation is level with the ground and there are no visible blocks or piers, it’s likely monolithic. Consulting building plans or a professional can also provide clarity.
At least 3 cubic yards for a 4-inch slab. You'll need 4.75 cubic yards for a 6-inch slab.
I think I have a water leak in my bathroom under the slab. Will a plumber have to break my slab to fix it?
For a 4-inch thick slab you will need at least 1.2 cubic yards.
how many yards of concrete will i need to do a 20 x20 x4 slab
because of the water
I go to a monolithic church, the largest in the city.