check this out the follwing link for your answer
http://www.slideshare.net/arunjimishra/mis-subsystems#btnLast
ess in mis which means Management Information Systems,
The prefix is 'mis' meaning bad, lack of, or incorrect.
mis. misfortune
The word is "misspelled". The prefix is "mis-" and typically, you'd just add the base word. Here are other examples: mistaken (mis+taken) misinterpreted (mis+interpreted) misunderstood (mis+understood)
MIS EXECUTIVE MEANS - Management Information System.
Management Information Systems (MIS) are made up of a series of subsystems. Each subsystem is designed to handle the data produced by different components of the MIS.
Data subsystem
yes
The main subsystems of Management Information System (MIS) include decision support systems, executive information systems, transaction processing systems, and knowledge management systems. Each subsystem is designed to support different aspects of organizational decision-making and information management.
a computer on the whole is a system ... it has a lot of subsystems .. these subsystems are said to be the computer subsystem ... thus in simple words , a subsystem found in a computer system is said to be a "Computer Subsystem"
There are two ways of communicating with a subsystem, either by sending stimuli to the subsystem itself to be re-directed to the proper recipient inside the subsystem, or by sending stimuli directly to the recipient inside the subsystem. In the first case, an association is defined with the subsystem itself to enable stimuli sending.A subsystem can have generalizations to other subsystems, i.e., the public and protected elements in the contents of a subsystem as well as operations and receptions are also available to its heirs.A subsystem may offer a set of interfaces, i.e., for each operation defined in an interface, the subsystem offering the interface must have a matching operation, either as a feature of the subsystem itself or of a specification element.
Strength Management is an interrelated subsystem of the EPMS.
Goal conflict occurs when the activity of a subsystem is not consistent with another subsystem or with the larger (basic) system.
sorry but i do not know, is for tech lab test
Job Data Documentation
Yes
central,