If work is not completed by the date on which it was promised, the contractor is in violation and should not be paid the full agreed amount. If the work is being built for an event on a specific date and is not completed, then the contractor should not be paid anything, as the work was worthless.
On an ordinary renovation contract, anything beyond 14 days late should be considered a very serious problem, and the owner would be justified in demanding an explanation and commitment for the earliest possible completion date.
If the contractor does not cooperate, cash in the performance bond and hire another contractor to finish the job as soon as possible.
Construction documents include all building plans, specifications, and supporting documents used during the completion of a construction project. These documents serve several purposes. First, they help translate the needs to the owner or developer into a buildable format that can be universally understood within the construction industry. Second, they allow the owner to put the project out for bid and to obtain permits from local authorities. Finally, they provide comprehensive instructions to the contractor as to how the project should be constructed.
nah
wits will not allow this.
no. there should be a gap to allow for drainage and more importantly expansion. in the summer wood swells so there should be a small gap and a larger one in the winter when the wood is contracted. about 3/8 of an inch in winter application is plenty so the wood can swell freely in the summer and not buckle.
In construction terms, eaves are the edges of the roof that form an overhang. They are often fitted with gutters to allow for drainage.
A spud barge has steel pilings which are driven in to the river bed to allow them to stay stationary and allow them to support construction operations.
To ensure there's enough of it to allow the reaction to go to completion.
A construction engineer would be most suited as the head of a construction company. This would allow them to design, plan, and manage the building of many types of buildings and structures.
The best place to find job descriptions for construction work is the Department of Labor. There are many variations of construction workers and browsing through the handbook will allow you to find what is right for you.
Typically, home construction loans are for one year. At the end of the year, the home presumably is built, and you get a standard mortgage. The time restrictions should be written into the contract. Many contracts allow for financial penalties if the contrator is not finished in 12 months. Some contracts allow for cancellation if the builder doesn't finish in 12-18 months.
Attic stock is excess construction material held to allow for repairs.
Construction machinery is any equipment used in the preparation of the site, construction and fitting out. used in building establishment, demolishing and carrying heavy materials. Their use is vital to save labour time, meet deadline and be able to minimise on cost