Total Cost = Variable Cost + Fixed CostVariable Cost = 4 per UnitTotal Units to produce = 15000Variable Cost = 15000 * 4 = 60000Total Cost = 60000 + 100000Total Cost = 160000
fixed and variable costs
Yes, the cost of heating and cooling is typically included in the electric bill as these systems rely on electricity to operate.
When you see TC = Total Costs on a break even chart it stands for Variable, Semi-variable and fixed costs....thus the total cost.
Raw materials is the only variable cost in the above options.
Debit heating and lighting expensesCredit expenses payable
In semi variable cost :variable cost = change in cost/change in output then with that rate * output = variable cost semi variable cost - variable cost = fixed cost
Electricity is the type of energy that makes lighting and heating possible.
Variable cost refers to the TOTAL variable cost of all units, whereas marginal cost is the variable cost of the last unit only. Variable cost is the sum of all the individual marginal costs. The derivative of the Variable Cost is the Marginal Cost. The integral of the Marginal cost is the Variable Cost.
No, Janitorial Cost is not a variable cost, it is a Fixed Cost.
Variable cost = Total Cost/ fixed cost
yes..depreciation cost is the variable cost..
Average Variable Cost = Total Variable Cost/ Quantity Average Cost = Average Fixed Cost + Average Variable Cost Average Cost = Total Cost/Quantity
Variable cost: The cost change with the change in activity is called variable cost. So as much fuel used cost increased accordingly so it is variable cost.
variable
Manufacturing cost is variable cost.
variable cost