Setup cost is the cost of setting up the machine for manufacturing of units of product.
Cost drivers are the actual activities due to which costs incurres like machine setup cost. As many time there is machine setup as many times there is machine setup cost to be incurred.
carrying cost, ordering cost or setup cost are major cost involved in inventory
Cost driver is the basic activity which increases the or utilize the cost while cost pool is that in which all costs are jointly shown for example machine setup cost is cost driver while over all overheads is cost pool.
DO YOU HELP SETUP GRANTS OR MAKE SUGGESTIONS ON WHAT GRANTS WORK ?
it tell us the best quantity to order to minimize the average period cost which include setup, purchase and holding costs. TC=DC+DS/Q+(P-d)HQ/2P
Cost drivers are activities due to which cost incurred for expample as many time as machines are setup for production as many time machine setup cost will be incurred so matchine setup is cost driver.
Cost drivers are the actual activities due to which costs incurres like machine setup cost. As many time there is machine setup as many times there is machine setup cost to be incurred.
Ordering cost, Setup cost, Holding cost and Stockout cost
Some can be free.
t
carrying cost, ordering cost or setup cost are major cost involved in inventory
$1995.00 plus setup and designation charges.
It would cost approxamitly $40,000 including the price of the server(S)
EOQ point is -(NOT)_ the same point of intersection.in most cases it is the intersection of (setup cost and purchase cost). caring cost is notwithin the curves because it is liner with total carve. Remember caring or ho;dong cost is per unit item per cycle.EOQ is the Min of (sum of two curves setup cost and purchase cost), even if Not the intersect point.in other word1) plot setup cost (Q)2) plot purchase cost (Q)plot the sum of ( 1 and 2) into curve one new curvefind the minimum point in this curve. this point is your EOQ.
Cost driver is the basic activity which increases the or utilize the cost while cost pool is that in which all costs are jointly shown for example machine setup cost is cost driver while over all overheads is cost pool.
Not really. It is much cheaper just to purchase a ledger.
Cost of setup and not everywhere has enough wind to make it a viable option