answersLogoWhite

0

What else can I help you with?

Related Questions

What is the budget or schedule that provides necessary input data for the direct labor budget?

production budget


Does An ECG provides direct information about valve function?

No, it doesnt.


What budget provides the starting point for preparation of the direct labor cost budget?

The direct labor cost budget typically starts with the sales budget, as it outlines the anticipated sales volume and revenue. From the sales budget, management can estimate the production requirements needed to meet demand, which then informs the direct labor needs based on the labor hours required per unit of production. Additionally, historical data on labor efficiency and wage rates may also be considered to finalize the direct labor cost budget.


Which companies provide budget direct insurance?

To find a company that offers direct insurance, consult with an insurance agent or broker. They can provide information on companies that can provide direct insurance at low costs.


What is a direct labor budget?

Direct labor budget tells the management that how much direct labor is required to finish the production of units.


What is direct labor budget used for?

Direct labor budget is used for controlling purpose as it tells that how much direct labor is required for specific job to be complete.


Where can I find contact information for MM Direct?

MM Direct is a retail service that provides the latest fashion in sports and outdoor for men, women, and children. The contact information can be found by searching MM Direct and finding their Customer Service at the bottom of their page.


What information is found on a flexible budget report?

Flexible budget reports are another type of internal report. The flexible budget report consists of two sections: (1) production data for a selected activity index, such as direct labor hours, and (2) cost data for variable and fixed costs. The report provides a basis for evaluating a manager's performance in two areas: production control and cost control. Flexible budget reports are widely used in production and service departments.


When is Direct Labor Budget prepared?

Direct labor budget is prepared during planning stage before the actual production starts.


What budgets are included in a production budget?

The production budget needs to be exploded into budgets for direct material, direct labor, and manufacturing overhead.


What budgets are prepared before the sale budget is it the budget income statement or the direct labor budget?

NONE


Can I get direct loans servicing for student loans?

Direct loan servicing is available for student loans. The following website provides additional information: yesiamcheap.com/2011/03/hate-direct-student-loan-servicing/