Depends on the type of stain, but usually about i would say 3 minutes.
Bleach can stain jeans within a few minutes of contact. The amount of time it takes for the stain to set will depend on the concentration of the bleach and the type of fabric. It is important to rinse the fabric thoroughly after bleaching to prevent staining.
24 hours
Pre-stain typically takes about 15-30 minutes to dry before applying the final coat of stain.
A gram stain procedure typically takes about 10-15 minutes to complete.
Stain typically takes about 24 hours to dry before it is safe from rain.
Stain typically takes about 24 hours to dry before applying polyurethane.
The smell of wood stain typically takes about 2-3 days to dissipate completely.
Bleach will take a stain out.
Deck stain typically takes around 24-48 hours to dry completely, but it can take up to a week to cure fully.
Deck stain typically takes around 24 to 48 hours to dry completely, but this can vary depending on factors such as temperature, humidity, and the type of stain used.
The smell of Minwax stain typically takes about 24 to 48 hours to completely dissipate.
Gum can not evaporate but it can mold and stain things in hot temperatures.