answersLogoWhite

0

The reorder points for Kony and Toshiki depend on factors such as lead time, average consumption rate, and safety stock levels. Typically, the reorder point is calculated using the formula: Reorder Point = (Average Daily Usage x Lead Time) + Safety Stock. To determine the specific values for Kony and Toshiki, one would need to analyze their consumption patterns and supply chain dynamics. Without specific data, it's impossible to provide precise reorder points for each.

User Avatar

AnswerBot

5d ago

What else can I help you with?