answersLogoWhite

0

Dissemination of obscene materials refers to the distribution or promotion of content that is considered offensive, indecent, or sexually explicit, often violating legal standards of obscenity. Laws governing this dissemination vary by jurisdiction, but typically aim to protect public morals and prevent harm, particularly to minors. Such materials may include pornography, graphic sexual content, or any media deemed inappropriate by legal or community standards. Violating these laws can lead to criminal charges and penalties.

User Avatar

AnswerBot

4mo ago

What else can I help you with?

Continue Learning about General Science

Dissemination in a sentence?

The bugs disseminated when they saw a rock was crashing down there way.


What types of classified materials require all standard classification markings?

Classified materials that require all standard classification markings include documents containing national security information that is classified as Confidential, Secret, or Top Secret. These markings ensure proper handling, storage, and dissemination of sensitive information. Additionally, documents related to sensitive compartmented information (SCI) or special access programs (SAP) also necessitate standard classification markings to denote their specific classification level and access restrictions. Proper marking is crucial for safeguarding national security and maintaining operational integrity.


What are weathered Earth materials are blown away called?

the process that moves wethe process that moves weathered materials athered materials


What is bill of materials?

A bill of materials is a list of materials and components used in a manufactured item, which are sometimes appended to an engineering diagram of the item.


What is the difference between Material take off and Bill of materials in piping?

A Material Takeoff is the process of analyzing(this includes list of materials with quantities and types,grades of materials and the weights of such materials) drawings and determining all the materials required to complete the design. A Bill of Materials is adocument that shows detailed desgriptions of materials used in completing a project,this includes,types of materials,specification of each item,gost of each item used,number and cost of labour used in completing the poject. The major difference between the two is:MTO is needed to make a BOM,a BOM aids in the procurement and requisition of materials.