1 mason and 1 helper will finish about 40 to 50 sq.m. per day (8 hours) depending on the area.
13
24
Approximately 6 hours a day 5 days a week with an hours break during the day.
23 times
The answer depends on the mason and his (her) work ethic.
150
The answer depends on how hard the mason works!
300
The number of 12-inch blocks a mason can lay in a day varies based on several factors, including the complexity of the project, the skill level of the mason, and working conditions. On average, a skilled mason can lay about 600 to 1,000 blocks in a standard eight-hour workday. However, this number can be lower for intricate designs or when additional tasks, such as mixing mortar or cutting blocks, are required.
If a mason is working on a block the time it takes to carve it depends on the details of the shape being carved, the material it is being carved from and the size of the block.
The number of concrete blocks a mason can lay in a day varies based on factors such as skill level, complexity of the project, and working conditions. On average, a skilled mason can lay between 300 to 500 blocks per day. However, this number can be lower for intricate designs or higher for straightforward applications with good weather conditions.
If they worked all 365 days in the year they needed to quarry, move and shape 315 blocks per day. Assume the slaves worked 10 hours per day then need to place in position a block every two minutes.
depends on the person, the size of the blocks, the length of your workday... ect
how big are the blocks and how many guys do you have laying them, and how fast and efficient are the workers. do they have to be mortered,