75.25 tiles (assuming no part of a tile is wasted and leaving no allowance for space between tiles.) buy at least 10 extra.
Math:
30.5 cm x 30.5 cm = 930.25 Square cm per tile.
a square meter = 100 cm X 100 cm = 10,000 square cm
7 square meter = 70,000 square cm
now divide.... 70,000 square cm / 930.25 square cm per tile = 75.25 tiles
To find the total area of the floor, you would multiply the length by the width. In this case, 8.4m x 10m = 84 square meters. Therefore, you would need 84 square meters to cover a floor that measures 8.4m by 10m.
The length of the floor is 5.5 meters because 2*(5.5+5) = 21 meters which is the perimeter
The amount of tiles needed to cover a floor will depend on the size of the floor.
The number of tiles needed to cover the floor is a function of the size of the tiles
To convert feet to meters, we use the conversion factor 1 ft = 0.3048 m. Therefore, the floor measures 3.9624m by 2.7432m. To find the area, we multiply the length by the width: 3.9624m * 2.7432m = 10.86 square meters. So, a floor measuring 13ft by 9ft is equivalent to 10.86 square meters.
17 (16.65) square meters are needed, at minimum.
You need3.11 square meters/area of each tile .
4.5 * 6 = 27 square meters
To find the total area of the floor, you would multiply the length by the width. In this case, 8.4m x 10m = 84 square meters. Therefore, you would need 84 square meters to cover a floor that measures 8.4m by 10m.
88.5 Sq. meters of carpet.
Around 50 square metres, as a rough guess!
If the floor area is 313 square meters, then the floor area is 313 square meters.
Well, the area of the floor would be 25*12, which is 300m2 which means that you would divide 300 by 7 to get around 42.8571419, which is how many liters of sealer that would be required to seal that floor.
The length of the floor is 5.5 meters because 2*(5.5+5) = 21 meters which is the perimeter
The amount of tiles needed to cover a floor will depend on the size of the floor.
The first floor is at 311 feet or 95 meters.
No. 5 metres by 5 metres is 25 square metres, thus 5 m2 of carpet is missing (if you wish to cover the entire floor, that is).