At present, on a commercial building site it would be between £2-£4pm
Well, darling, to convert cost per square meter to cost per lineal meter, you need to know the width of the material. Once you have that, simply divide the cost per square meter by the width in meters to get the cost per lineal meter. It's as easy as pie, honey. Just remember, math doesn't have to be boring!
1 mason and 1 helper will finish about 40 to 50 sq.m. per day (8 hours) depending on the area.
4.94 per sq meter so rounded up to 5 per sq meter
About 10.764 square feet per square meter.
25.5mm
You will need to know the weight of the plastering. If you identify a weight per cubic meter, multiply it by the number of cubic meters that you have.
"1 meter per second" is not a rate of acceleration. "1 meter per second per second" or "1 meter per second2" is. The force required to accelerate 1 kilogram of mass at that rate is called "1 Newton".
55,000 - 65,000 each year is made on average by plastering
meter per second is a unit of rate. It means that it is the distance traveled in meters per one second.
ISMB equals 1000per meter.
What is the maximum flow rate of a two inches in diameter of a pipe in cubic meter per hour?ImprovecapitalOneround('alternateMsg');
Per linear meter refers to a unit of measurement that expresses a quantity of an item or material per one meter of length. It is commonly used to indicate the rate or cost of something in relation to each meter of length.
joules
impossible as cubic meter per hour is volume flow rate while psi is pressure unit.
The unit rate for soil would typically be measured in kilograms per square meter. This unit rate indicates how many kilograms of soil are present in each square meter of the specified area.