It is the opposite of mutually exclusive. Potentially inclusive are events that can happen at the same time, as mutually exclusive events can't.
gay
Yes, consumers and the marketing environment are certainly mutually inclusive. Without the consumer, corporations would have nobody to market their products to.
Any two events in which one cannot happen without the other.
fff
Potentially inclusive events are events that can happen simultaneously. For example, events A and B can occur at the same time. When these events do cannot occur simultaneously, then then are called Mutually exclusive (opposite). Potentially Inclusive: If A is heads of Coin 1 and B is heads of Coin 2, then tossing of both the coins is potentially inclusive since you can get heads on both the coins same time. Mutually exclusive: If A is heads and B is tails , then tossing of a coin is mutually exclusive since you cannot get heads and tails at the same time. You either get heads or tails.
The opposite of mutually exclusive is collectively exhaustive, meaning that the options or events being considered cover all possible outcomes without any overlap.
Mutually exclusive projects means that the acceptance of one project eliminates the others fromconsideration. Projects are said to be mutually exclusive when tehy cannot be undertaken simultaneously.
Mutually exclusive is the situation in which only one of two projects designed for the same purpose can be accepted and independent projects is a project whose feasibility can be assessed without consideration of any others.
The simplest way to explain a mutually exclusive project would be in terms of real estate building. If you were debating whether to build a one or two story house on a plot of land, that is a mutually exclusive project because you cannot build both houses on one plot.
Independent projects are those which are not related or dependent on any other projects while in mutually exclusive projects if one project is selected other project automatically discards
Knowledge Management (KM) and Project Management (PM) are exclusive scientific areas, even though they are inclusive practice areas. Another related exclusive science and inclusive practice is Configuration Management (CM). It can serve as the proverbial glue between PM and KM.