At Milestone C, a production representative system, also known as a production representative prototype, is required for testing and evaluation. This prototype should closely resemble the final production system and is used to assess the system's performance, readiness for production, and ability to meet user requirements. Additionally, operational testing and evaluation are conducted to verify the system's effectiveness in a realistic operational environment.
An ACAT I program is required to submit a quarterly Selected Acquisition Report (SAR) when it meets specific criteria, including having a total program cost exceeding $1 billion in research, development, test, and evaluation (RDT&E) or $300 million in procurement. The reports must be submitted to provide updates on the program's cost, schedule, and performance, ensuring oversight and informed decision-making at higher levels of the Department of Defense. SARs are typically required for programs that are currently under development or in production phases.
Sales forcast determines that how much production is required and then to meet that production level how much new investment and machinery etc required.
OT&E Results
Providers are not required to undertake an evaluation at the resource.
The cost of a mental evaluation depends on what kind of evaluation is required and where it the world it is performed.
The relationship between production and cost in any manufacturing process varies based on volume produced and whether any part of the manufacturing process is outsourced or performed by subcontractors. Additionally, production and cost ratios vary based on the amount of automation involved in production and the amount of human oversight and involvement required.
How do you calculate the production line personnel required?
it is required to improve the efficiency of production.
The relationship between the three concept of test,measurement and evaluation are closely related with evaluation coming first followed by measurement and test.The relationship is such that if the need of evaluation arises,it required measurement which will reguired the used of test
oxygen
oxygen