Construction of the Albert Dock in Liverpool began in 1829 and was completed in 1846, taking a total of 17 years to finish. It was designed by architect Jesse Hartley and was the first structure in the world to be built entirely from cast iron, brick, and stone, without the use of wood. The dock was a significant advancement in maritime architecture and played a crucial role in Liverpool's shipping industry.
a long time
it take 2 days
It took 273 days for them to build the pyramid
It takes a long time...
it took 27years to build interstate 75.
how long does it take to build a asimo
how long did it take to build the half moon
how long did it take to build the scottish parliment?
how long did it take to build cabot tower
hs2 will take 15 years to build
how long does it take to build a beam bridge of 2400 sq ft
it took 3 years
How long did it take to build st James cathedral london
a long time
how long did it take to build seaworld in sandiego
3 years to build the mcg
It took 5 years to build.