2.5 to 3.5Ha "An Introduction to waste technologies" - Steve Last
Farmers needed special plows to farm the land in the Plains of the U.S for a few reasons. One reason was that so much of the land needed to be plowed.
The amount of land needed to build depends on several factors, including the type of project (residential, commercial, industrial), zoning regulations, and local building codes. For example, a single-family home may require a lot of around 5,000 to 10,000 square feet, while a commercial building could need several acres depending on its size and intended use. Additionally, considerations for parking, landscaping, and setbacks can further influence the total land requirement. Ultimately, it’s essential to consult local regulations and conduct a site assessment for accurate planning.
He was the Emperor of France and needed cash to finance his European War.
There are many people who have owned land, but did not have much power. More information is needed to know which person would be the correct answer.
Because it cost them too much money to work on the land. But they still needed jobs, so they became tenant farmers.
about an acre
If you're looking into buying an incinerator of that power, you probably shouldn't be asking here, but instead at a place that already has one-- recycling plants and funeral homes would be a good start. Ask them where they got theirs.
The cost to build an incinerator can vary significantly based on factors such as size, technology, location, and local regulations, typically ranging from $100 million to over $1 billion. Smaller facilities may cost around $50 million, while larger, more advanced plants can exceed these estimates. Additional expenses for land, permits, and operational costs must also be considered. Overall, the investment is substantial, reflecting the complexity and environmental considerations involved.
It depends upon the specific piece of land, zoning requirements, easements, etc. Could be anywhere from 6000sqft to much, much more, especially if on-site parking is required.
do not buy it
The cost to build an incinerator can vary widely depending on its size, technology, and location, typically ranging from $10 million to over $300 million. Factors such as environmental regulations, the scale of operations, and the waste processing capacity significantly influence the total cost. Additionally, ongoing operational and maintenance expenses must be considered, which can impact the overall financial feasibility of the project.
13 acres
10 meters of wire
ALOT. unless its a poor area.......
depends on were you buy the land land is about 200,000 and a nice house is 500,000-1,000,000
9000 sqft
You can not build a wall out of plaster, you need bricks/blocks/stone and cement to build a wall.