answersLogoWhite

0

Find a building where all doors and windows can be shut tightly.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

What is treatment of an small antibioma in gluteus maximus?

It will require exploration and evacuation of the antibioma


For what categories of hurricanes would evacuation be highly encouraged?

Evacuation would be highly encouraged for Category 3 or higher hurricanes due to their potential for causing significant damage, widespread power outages, and hazardous storm surges. Additionally, evacuation may be necessary for areas prone to flooding or landslides, regardless of the hurricane's category.


Evacuation may reqiure you to do what?

Evacuation may require you to gather essential belongings, such as important documents, medications, and personal items, while ensuring you leave quickly and safely. It's crucial to stay informed about the evacuation route and any designated shelters. Additionally, you should communicate your plans with family and friends to ensure everyone is accounted for. Lastly, remain calm and follow any instructions from emergency officials.


What is progressive horizontal evacuation?

Horizontal evacuation is when you have to move horizontally on the same floor to get to safety. You may have different steps to take in order to get out of the building.


What is a step in hurricane evacuation?

One step in hurricane evacuation is to follow evacuation orders from local authorities. This may involve leaving your home and seeking shelter in designated evacuation zones or evacuation shelters to stay safe from the storm. It is important to have an evacuation plan in place ahead of time and to follow it to ensure your safety.


Does evacualting an air conditioning system to 28 vacuum remove compressor oil?

A tiny bit of oil may be removed during the evacuation of the system. This is not enough to require the addition of oil as most of the oil will remain in the system.


Which casevac priority must have evacuation take place within 24 hours?

Urgent Evacuation - Evacuation to next higher echelon of medical care is needed to save life or limb. - Evacuation must occur within two hours. Urgent Surgical Evacuation - Same criteria as Urgent. The difference is that these patients need to be taken to a facility with surgical capabilities. Priority Evacuation - Evacuation to next higher echelon of medical care is needed or the patient will deteriorate into the URGENT category. - Evacuation must occur within four hours. Routine Evacuation - Evacuation to the next higher echelon of medical care is needed to complete full treatment. - Evacuation may occur within 24 hours. Convenience - Used for administrative patient movement.


When was the battle of dunkirque?

The Evacuation of Dunkerque May 27 - June 5, 1940


When did British troops evacuate from Dunkirk?

The evacuation was ordered on the 26 May 1940


What is the date of the evacuation of Dunkirk?

27 May until 4 June 1940


What is a staged evacuation?

what is staged evacuation


Why should charging hoses not be used for evacuation?

Charging hoses should not be used for evacuation because they are typically not designed to handle the vacuum conditions required during the evacuation process. They may contain impurities or moisture that can contaminate the system, leading to inefficiencies or damage. Additionally, their construction may not withstand the pressures involved, potentially resulting in leaks or failures. Using proper evacuation hoses ensures safety and the integrity of the refrigeration system.