answersLogoWhite

0

The critical path is the set of activities that can't be put off -- they determine how long the project will take overall, and a delay in any of these activities will delay the project.

You can always put off the slack, however, without increasing the total duration of the project. So the answer is "Yes, there can be no slack time in a critical-path network diagram."

User Avatar

Wiki User

16y ago

What else can I help you with?

Continue Learning about Industrial Engineering

Construct the network diagram and identify the critical path?

Construct the network diagram and identify the critical path? Activity Immediate predccassors days A B m A - 2 4 3 B A 1 3 2 C A 2 10 6 D C 1 3 2 E A 1 5 3 F B 2 4 3 G C 3 7 5 H C 0.5 1.5 1 I F,h 1 2 1.5 J I 1 3 2


Give detail of critical path analysis network?

See the link section for a detailed explanation. In a nutshell, the idea is to calculate those tasks that take the longest and cannot be skipped nor done in parallel. These tasks become your critical path - which define the shortest amount of time the project will take to complete. Some projects may have more than one critical path; though the one with the longest time frame will define the time frame. All other tasks can be done in parallel or can be skipped. Once the critical path is defined, then one can try to redefine certain components so as to remove them from the critical path. The fewer items on the critical path the smaller the risk of failure and the easier it is to get more things done in parallel.


Is a network diagramming technique used to predict total project duration.?

Yes, a network diagramming technique, such as the Critical Path Method (CPM), is used to predict total project duration. It visually represents project tasks and their dependencies, allowing project managers to identify the longest sequence of tasks that must be completed on time for the project to finish as scheduled. By analyzing these paths, project managers can estimate the earliest and latest possible completion dates, helping to optimize scheduling and resource allocation.


Definition of pert cpm?

Its the abbreviation of Program Evaluation and Review Technique / Critical Path Method. The critical path method (CPM) is a project modeling technique developed in the late 1950s by Morgan R. Walker of DuPont and James E. Kelley, Jr. of Remington Rand.Kelley and Walker related their memories of the development of CPM in 1989. Kelley attributed the term "critical path" to the developers of the Program Evaluation and Review Technique which was developed at about the same time by Booz Allen Hamilton and the US Navy. The precursors of what came to be known as Critical Path were developed and put into practice by DuPont between 1940 and 1943 and contributed to the success of the Manhattan Project. CPM is commonly used with all forms of projects, including construction, aerospace and defense, software development, research projects, product development, engineering, and plant maintenance, among others. Any project with interdependent activities can apply this method of mathematical analysis. Although the original CPM program and approach is no longer used, the term is generally applied to any approach used to analyze a project network logic diagram. PERT is a method to analyze the involved tasks in completing a given project, especially the time needed to complete each task, and to identify the minimum time needed to complete the total project. PERT was developed primarily to simplify the planning and scheduling of large and complex projects. It was developed for the U.S. Navy Special Projects Office in 1957 to support the U.S. Navy's Polaris nuclear submarine project. It was able to incorporate uncertainty by making it possible to schedule a project while not knowing precisely the details and durations of all the activities. It is more of an event-oriented technique rather than start- and completion-oriented, and is used more in projects where time, rather than cost, is the major factor. It is applied to very large-scale, one-time, complex, non-routine infrastructure and Research and Development projects. An example of this was for the 1968 Winter Olympics in Grenoble which applied PERT from 1965 until the opening of the 1968 Games. This project model was the first of its kind, a revival for scientific management, founded by Frederick Taylor (Taylorism) and later refined by Henry Ford (Fordism). DuPont's critical path method was invented at roughly the same time as PERT.


What is a PERT Chart?

A PERT (Program Evaluation and Review Technique) chart is a graphic representation of a project schedule, showing the sequence of tasks, which tasks can be performed simultaneously, and the critical path of tasks that must be completed on time in order for the project to meet its completion deadline. A Gantt chart is another representation of a project schedule, but specifically uses a bar chart.

Related Questions

How can one determine the critical path in a network diagram?

To determine the critical path in a network diagram, you need to identify the longest path of connected tasks that must be completed in order to finish the project on time. This path has zero slack or float, meaning any delay in these tasks will cause a delay in the overall project completion. By calculating the duration of each task and their dependencies, you can identify the critical path.


How does total slack impact a project network's critical path?

Total slack refers to the amount of time a task can be delayed without affecting the project's overall timeline. If a task on the critical path has total slack, it means that the project's completion date can be extended without impacting the critical path. This can provide flexibility in managing the project's schedule and resources.


What is cpm and pert?

Critical Path Method (CPM) - A schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram.


What is the differences between critical path and slack time?

The critical path is the longest path through a project, indicating the shortest possible time needed to complete the project. Slack time is the amount of time a task can be delayed without delaying the project completion. Tasks on the critical path have zero slack time, while non-critical tasks have slack time.


What are the uses of the critical path?

These critical path enables PMs to know which activities (tasks) are essential for Project Completion (can delay the project), and which activities are not. It also gives a clear idea on how to accelerate the projects (eg by adding more resources to the tasks on the critical path).Answer:Critical Path Method: This is the schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram. The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start date


Critical path of a project?

The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start date


What is a critical path network diagram example and how can it help in project management?

A critical path network diagram is a visual representation of the sequence of tasks in a project and their dependencies. It helps project managers identify the longest path of tasks that must be completed on time to ensure the project stays on schedule. By highlighting critical tasks and their interdependencies, the diagram allows for better planning, resource allocation, and risk management to ensure timely project completion.


What is defined by a critical path?

The Critical Path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start date. Critical Path is one of the key outputs of the Project Schedule Creation activity


How do you explain the critical path analysis?

Critical path method - This is the schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram. The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start date.


Why critical path is critical to project management?

Critical path method - This is the schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram. The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start dateThe Critical Path and Duration of the Critical Path, gives the project manager a clear picture of how long all the activities can take to complete. It also helps him to identify the flexibility in the project schedule by calculating the early and late start and finish dates of each activity on each path. The schedule flexibility of an activity is measured by the positive difference between the late start date and the early start date for the activity and is called float time or total float.


What is the significance of Critical Path Analysis in Project development?

Critical path method - This is the schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram. The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start date.The second important feature of the critical path method is to identify the flexibility in the project schedule by calculating the early and late start and finish dates of each activity on each path. The schedule flexibility of an activity is measured by the positive difference between the late start date and the early start date for the activity and is called float time or total float.Without a proper Critical Path Analysis, an efficient Schedule for the Project cannot be created


What is critical chain method?

Critical path method - This is the schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram. The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start dateThe important feature of the critical path method is to identify the flexibility in the project schedule by calculating the early and late start and finish dates of each activity on each path. The schedule flexibility of an activity is measured by the positive difference between the late start date and the early start date for the activity and is called float time or total float.