Look for the meaning of one lay length of a mooring hawser
Layoffs not Lay offs
Engineering is the strongest industry in Leicester. They manufacture machine tools and control systems (Jones & Shipman), foundry equipment (Richards Engineering), materials handling equipment (Transmon Engineering), suspension components for rail, marine, and industrial applications (Trelleborg). Other is food production (crisps: Frito-Lay).
Oh, dude, technically, yeah, you can still get an industrial piercing even if you have your helix pierced. It's like having a sandwich with extra toppings, you know? Just make sure your ear can handle the extra bling without freaking out. But hey, if you're up for it, go for that industrial look and rock it like a boss!
Design of plant layout involves decision of placement of various equipments and facilities in a manufacturing plant. The design attempts to achieve an optimum balance between several objectives which may often be conflicting with each other. The objectives to be optimized in designing a plant lay out include the following.Provide enough space for the various equipments, facilities and activities carried out in the plant. The facilities include the facility for storage and movement of raw material, work in progress and finished goods required or produced in the plant. The activities carried out in the plant include the manufacturing operations as well as maintenance activities.Facilitate smooth movement of material during manufacturing process.Reduce the material handling cost.Provide good and safe working environment for the people working in the plant.Reduce the total space requirement.Reduce the cost of facilities to be constructed or fabricated.
Lay a long length of rope on the ground, straight out. Grab one end and jerk it upward and downward. A wave will pass down towards the other end of the rope, this is a transverse wave.
Lay a long length of rope on the ground, straight out. Grab one end and jerk it upward and downward. A wave will pass down towards the other end of the rope, this is a transverse wave.
Lay length is calculated by measuring the distance a rope or cable extends when laid out flat, typically from one end to the other. If you know the diameter of the coil or spool and the number of turns, you can use the formula: Lay Length = (Number of Turns x Diameter of Coil) / π. Alternatively, for ropes with a specific lay pattern, you may need to measure the angle of the lay and apply trigonometric principles.
Lay a long length of rope on the ground, straight out. Grab one end and jerk it upward and downward. A wave will pass down towards the other end of the rope, this is a transverse wave.
Lang's lay
a rope consisting of three wire strands and three fibre strands layed right handded around a fibre core
"Pushing rope" means attempting an action that is ultimately futile. For a demo, lay a length of rope on the floor, stand at one end, and attempt to push it away from yourself. This phrase is commonly used to denote a man's lack of sexual prowess, for reasons that should now be obvious.
This depends upon the type of rope, it may be of three types - a neutral lay, right hand lay, and left hand lay. This describes how the rope is built up from its smaller parts. For a neutral lay rope, which is common for many braided ropes, you can coil the rope without any special technique and it will coil properly. Stranded ropes, where you can see the diagonal lines, called contlines, along the rope require a technique or they will kink. As you create the coil lopps, whether on your arm or on a post, you must alternate every other loop with a twist. That is, make one clean loop, and the next loop requires you to put a twist to right or left, depending on the rope lay, as you place the 2nd loop. This is continued until the rope is fully coiled.
There are multiple ways this sentence could be corrected to. Two that I could think of are--"Since this morning, the rope lie near the gate.""The rope lie near the gate since morning."has lay should be 'lie', because lay's past tense is 'lie'.
To lay back.
the lay ratio is the ratio between the lay length of the cabble and the Outer diameter af the cable( or the layer) lay ratio = lay length / OD and the lay ratio standard from ISO
I believe this is a defect in the rope cable. A "birdcage" refers to the separation in the rope wraps caused when a cable is stressed. When the separation is such that you can see a gap between one lay of rope and the rest of the cable, the defect is called a birdcage.