Reverse engineering is when you have an existing item and you strip it down to see how it's made so that you can copy it and make more.
Reengineering is a term applied to altering the practices and/ or methods of a company or a business - it's not something that engineers do. It's, essentially, technobabble talk for "changing the way the company does things".
-Sponsor: articulates re-engineering goals. -Steering Committee: oversees the re-engineering project, reviews status, identifies concerns. -Design Teams: develop new processes. Champion: keeps sponsor informed, coordinates design team activities.
Here the real way---1 Ask 2 Imagine 3 plan 4 create 5 improve.
Traditional manufacturing typically involves large-scale production in centralized facilities, utilizing advanced machinery and assembly lines to achieve efficiency and economies of scale. In contrast, a cottage industry refers to small-scale, home-based production, where individuals or families create goods using simple tools and techniques, often emphasizing craftsmanship and local materials. While traditional manufacturing prioritizes mass output and standardized products, cottage industries focus on artisanal quality and customization, catering to niche markets.
the fundamental rethinking and radical redesign of business process to achieve dramatic achievements in the contemporary measure of performance, such as, cost, quality service and speed the fundamental rethinking and radical redesign of business process to achieve dramatic achievements in the contemporary measure of performance, such as, cost, quality service and speed Shahzad Habib shahzad_ie@hotmail.com
They should be re-located to Syria and the degree should be 45
Re-engineering: rethinking or changing or redesigning the processes of doing things in a business. Restructuring: takes place when new positions are created to support change -re-engineering.
There is not much difference between Re model and hybrid model. The only difference being hre(vi/vo) reverse voltage gain. The remainig parameters are comparable. hie=beta*re hfe=beta hoe=ro
Probably a rather philosophical question, but if you want to make a quote it is the difference between an architect and a construction worker. Engineers design a framework and decide how the building works in its entirety and how it interconnects with the outside world and programmers execute the master plan, putting up the walls and installing the plumbing and electricity.
Re-engineering: rethinking or changing or redesigning the processes of doing things in a business. Restructuring: takes place when new positions are created to support change -re-engineering.
what is the difference between Re oreder level and EOQ
engineering again
There is no difference apart from the USA's penchant to change the spelling from re to er.
its any type of software testing which seeks to uncover software regressions which occur whenever software functionality that's was previously working correctly stops working as intended.......SIR.CARLSON DAIDO
Any word that is all caps in email signifies that the writer is yelling.
Yes there is no difference. That's OK simply confirms what OK does.
There really is no difference between the phrases "that's ok" and "ok." They both mean that something is alright.
one starts with de and one starts with re