add the total cost of all materials used and then you would figure out how long the job would take {lets say 10 hours} and then you would multiply that by the charge per hour of labor. then you would have this equation

cost of materials+(hours worked x charge per hour)=cost of job

hope this helped

User Avatar

Wiki User

12y ago

What else can I help you with?

Continue Learning about Industrial Engineering

What is the total manufacturing cost recorded for Job 1225?

500 billion dollars wise guy


What is the predetermined manufacturing overhead rate with given info Table Top 1700 Table Leg 500 Drawer 370 Assume a 35 per hour wage rate to the assembly employees The company uses a job order cost?

To calculate the predetermined manufacturing overhead rate, you first need to determine the total estimated overhead costs and the total estimated direct labor hours. Assuming the total costs for Table Top, Table Leg, and Drawer are $1,700, $500, and $370 respectively, the total estimated overhead would be $2,570. If you know the total direct labor hours needed for production, you can divide the total estimated overhead by those hours. For example, if the total direct labor hours is 100 hours, the predetermined manufacturing overhead rate would be $2,570 / 100 = $25.70 per hour.


What type of degree do I need to qualify for a manufacturing engineer job?

To qualify for a manufacturing engineer job is a minimum of a Bachelor of Science degree from the Accreditation Board of Engineering and Technology. According to, http://www.samplejobdescriptions.org/manufacturing-engineer-job-description.html , it is also helpful to have a master's degree in engineering as well as on the job experience.


What kind of worker is someone who has an industrial job often in manufacturing and receives wages?

Blue Collar worker


A short note about manufacturing industries in London?

Industries in London form an integral part of London economy. Various industries such as manufacturing, shipbuilding, aircraft, chemical, food processing etc. offer a wide array of job opportunities.Industries in London comprise both small scale as well as large scale industry. Different business communities boost the growth of various industries in London. The manufacturing industry is the largest industrial sector in the capital of England. 16% of the total workforce is engaged in this industry.

Related Questions

How do you calculate total cost of job?

i


Total manufacturing overhead cost?

Total manufacturing cost A company assigns overhead cost to completed jobs on the basis of 116% of direct labor cost. The job cost sheet for Job 413 shows that $23,936 in direct materials has been used on the job and that $10,400 in direct labor cost has been incurred. A total of 1,450 units were produced in Job 413.


Manufacturing overhead costs?

Total manufacturing cost A company assigns overhead cost to completed jobs on the basis of 116% of direct labor cost. The job cost sheet for Job 413 shows that $23,936 in direct materials has been used on the job and that $10,400 in direct labor cost has been incurred. A total of 1,450 units were produced in Job 413.


What is the total manufacturing cost recorded for Job 1225?

500 billion dollars wise guy


What are the three cost categories on a job cost sheet?

direct material cost , direct labor cost , manufacturing cost


What does is the cost of a manufacturing job?

I'm not sure what costs you are referring to for having a manufacturing job. I can tell you that manufacturers often have a starting pay of $30,000 a year.


How do you calculate total time for a job?

i donnt knoww .?


Calculate rate per hour on wire cut work?

Job workers using this formula as given :- total hrs. in Single pass (Single cut)=Total Path length x job thickness / 1500 total hrs. in Double pass (Double cut)=Total Path length x job thickness / 1200 total hrs. in Triple pass (Triple cut)=Total Path length x job thickness / 900 total hrs. in Four pass (Four cut)=Total Path length x job thickness / 600 and the Rates are Rs.200.00/hr to Rs.250.00/hr.


In job cost systems manufacturing overhead is an indirect cost of jobs yes or no and A Necessary Element in Production yes or no?

Yes to both.


What is a job order cost system?

You have two basic types of manufacturing processes- continuous and discrete or job shop. A job order cost is based upon the direct materials/components and direct labor associated with making this specific final product. You would tyoically add manufacturing overhead and profit to this cost (a build up) to get to fully loaded costing and pricing. A job order cost system can be standard cost based or an actual cost build-up (time and materials) if you are making custom units.


What is accountant job?

what is the cost accounting system used by a contract manufacturing a number of identical units for multiple customers


How does general contractor get paid?

a percentage of total cost of job