Garments Production Process:
Step wise garments manufacturing sequence on industrial basis is given below:
Design / Sketch
↓
Pattern Design
↓
Sample Making ↓
Production Pattern ↓
Grading ↓
Marker Making ↓
Spreading ↓
Cutting ↓
Sorting/Bundling ↓
Sewing/Assembling ↓
Inspection ↓
Pressing/ Finishing ↓
Final Inspection ↓
Packing ↓
Dispatch
Production Planning
The EU's Generalised System of Preferences (GSP) scheme, which provides garment manufacturers with duty-free access to the EU market--subject to certain conditions relating to the origin of the materials used in the manufacture of the garment.
AQL means ACceptable Quality Lebel.for the costumer satisfication
A marker is a tracing of all the pattern pieces needed to cut out a given style. These are commonly made by computer.
Total Flow Area
complite process of garment export house by flow chart
Can you please help me for my assignment? I want the details of operation break down & flow chart
A general flow chart is the ongoing comparison of particular data during various time periods. An example of a flow chart of the hotel industry would be a hotels annual profits compared between years 2000 through present 2014.
its about how the units are interacting to provide the expected service for a customer
1)Basic flow chart-shows the main steps in a process for a good overview 2)process flow chart-gives details of a process by listing the main steps and sub-steps 3)developement flow chart- is similar to process flow chart but identifies persons or department involved in a process. 4)oppertunity flow chart- highlights decision making steps and inspection points.
what are the advantages and disadvantages of incentive in garment industry ?
Informal sector in garment and textile industry?
Notes on history of time study in garment industry
A flow chart is a type of model, but not every model is a flow-chart.
flow chart of plannning pocess
the structure chart differs from flow chart in these principle ways: 1- It is difficult to identify different modules of the software from its flow chart representation. 2- Data interchange among different modules is not represented in a flow chart. 3- sequential ordering of tasks inherited in a flow chart is suppressed in structure chart.
flow chart for body