E = Electrode, 7= 70,000 tensile, 1= all postion , T = tubular

User Avatar

Wiki User

12y ago

What else can I help you with?

Continue Learning about Industrial Engineering

What are the Oxygen-acetylene welding equipments?

Oxygen tank, Acetylene tank, regulators for each tank, hoses, a torch, and a striker. Check valves are also a good idea if they're not already installed.


How do you cut pipe ends for welding perpendicular joints?

DOWN AND DIRTY: For an end or corner joint, cut each intercepting piece at a 45. For T joints, cut the top of the post with two opposing 22.5s to give you a full 45 and cut your top rail with a corresponding 45 to the longitudinal centerline. Peen pieces into place if necessary. Saddle markers are available at most oilfield supply or welding supply stores. They are available for all common pipe sizes... Simply clamp it on the pipe and mark your cut. No peening necessary.


What is TOPSIS method in Multi-criteria -Decision -making?

it stand for Technique For Order preference BY Similarity to Ideal Situation The principle behind TOPSIS is simple: The chosen alternative should be as close to the ideal solution as possible and as far from the negative-ideal solution as possible. The ideal solution is formed as a composite of the best performance values exhibited (in the decision matrix) by any alternative for each attribute. The negative-ideal solution is the composite of the worst performance values. Proximity to each of these performance poles is measured in the Euclidean sense (e.g., square root of the sum of the squared distances along each axis in the "attribute space"), with optional weighting of each attribute.


What is mean by pass line in cold rolling mill?

The pass line in a cold rolling mill passes through the center of the billet which is on the funace exit rollers and runs through each stand through the shear blades dividing the shear prior to the cooling bed. All of the guide equipment is aligned to the pass line.


If a welder is qualified to multiple qualification on 12.750 250 pipe under api 1104 can he roll out weld a 20 500 weld?

No, a welder qualified under API 1104 for 12.750 250 pipe cannot automatically roll out weld a 20 500 weld. Each welding procedure qualification (WPQ) is specific to certain variables, including pipe diameter and wall thickness. The welder would need to demonstrate qualification for the new pipe specifications to ensure compliance with safety and quality standards.