answersLogoWhite

0

Power plant jobs are known to pay well, but most applicants have a difficult time getting hired for entry level positions. Taking a career aptitude test called a POSS Test, which is available free online, can give an applicant an idea what they should familiarize themselves with before applying for power plant operator jobs.

Once you get your foot in the door it is easier to transfer to other power plant careers within the company, such as electrical engineer jobs.

For more information, do SPECIFIC online searches such as:

high paying power plant jobs in (your state)

entry level power plant jobs

practice POSS Test

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

How do you get hired for security at perry nuclear power plant?

If you don't know someone in security at perry you don't get hired.


How much money does a power plant operator make an hour?

The average power plant worker will earn 69,000 dollars per year. This will fluctuate a lot between entry level and someone with years of experience.


How can you help make nuclear power?

The average man cannot "help" make nuclear power. Once the plant is online, there is a crew hired by the owner of the plant to run it. I guess you could apply for any job openings at your nearest plant.


What is the normal size of a nuclear power plant?

There is no "normal size". The size depends on the design power level, the more power it is designed to generate the larger the plant will usually be.


Pokemon LeafGreen Zapdos?

He's(she's) in the power plant(level 50)


Is zapdoes un the power plant in Pokemon FireRed?

Yes! It is at level 50


Is tail water level and minimum water level on hydro power plant the same?

No, Tail water level is level of water in d/s after discharge while mini. water level if water level in reservoir for run the hydro power turbine


How do you get Zapdos on ptd?

Get 6 level 100 electric type pokemon and go to the power plant


Is power lock and key less entry same?

Not necessarily. Keyless entry will have power door locks, but not all power door locks are coupled to a keyless entry system.


WHAT IS Load duration curve in power plant?

A load duration curve in a power plant is a graphical representation showing the relationship between the amount of power generated and the duration for which that power level is sustained. It helps to analyze the load profile of a power plant over a specific period, typically on a daily or yearly basis. This curve is useful for optimizing the operation of the power plant to meet the varying demand for electricity.


How do you find Zapdos in Pokemon heartgold and what level is he on?

After you obtain all the Kanto Gym Badges, it will appear outside the Power Plant. It will be at level 50.


Where are the wasp cameras in the power plant on the simpsons hit and run level 4?

there are some in the trailer park