Continue Learning about Management

What action is required if the initial hazard control choice cannot reduce residual risk to an acceptable level?

If the initial hazard control choice cannot reduce residual risk to an acceptable level, it is necessary to implement additional control measures. This may involve using a combination of controls, such as engineering, administrative, or personal protective equipment, to further mitigate the risk. Additionally, a reassessment of the hazard and a review of alternative controls should be conducted to identify more effective solutions. Continuous monitoring and evaluation of the implemented controls are also essential to ensure ongoing effectiveness.


What does residual risk mean in the CRM process?

A residual risk is the remains of a risk on which a response has been performed. As part of CRM, you are managing some risk, for which you will have some risk response or strategy. A residual risk is the reminder of the risk that remains after you have implemented a risk response.


Residual risk in rm process?

Residual risk in the risk management process refers to the level of risk that remains after all mitigation measures and controls have been implemented. It acknowledges that while risks can be reduced, they cannot be entirely eliminated. Organizations must assess and monitor these residual risks to ensure they are within acceptable limits and are prepared to respond if they materialize. Effective communication about residual risks is crucial for informed decision-making and strategic planning.


What does term residual risk mean in crm process?

Risk that remains after all controls have been identified and selected


What are types of control in business organization?

· Feedback control · Concurrent control · Feedforward control

Related Questions

What are residual powers?

Residual Powers are powers that the State have complete control over. Concurrent Powers are shared amongst the State and the Commonwealth, but where there is conflict the Commonwealth will prevail. Exclusive Powers are powers that only the Commonwealth have control over.


What is myoelectric control?

Myoelectric control uses the signals from a residual limb for the movement of the prosthetics. Myoelectric control technologies obtain signals from the skin on the limbs.


What is myoelectricity?

Myoelectric control uses the signals from a residual limb for the movement of the prosthetics. Myoelectric control technologies obtain signals from the skin on the limbs.


How would roaches react to pest control spray?

Reaction is usually due to the flushing action of either the residual insecticide.


Residual risk is determined when?

Residual risk is determined after you reassess the hazards as if the controls were in place.


What is a residual lake?

Lakes which are made by residual rocks which are left after weathering and erosion and form the residual lakes.


What is a residual haunting?

A residual haunting is a playback of a past event.


Who does Residual income of a firm belongs to?

The residual income of the firm belongs to


What are residuals?

Residual Powers are powers that the State have complete control over. Concurrent Powers are shared amongst the State and the Commonwealth, but where there is conflict the Commonwealth will prevail. Exclusive Powers are powers that only the Commonwealth have control over.


What is the functional residual capacity FRC composed of?

Functional Residual Capacity (FRC) = Expiratory Reserve Volume (ERV) + Residual Volume (RV)


The air remaining in the lung after a maximal expiration is the?

residual volume


The residual income of the firm belongs to?

residual income belongs to the common stockholders.