The Major Differences and Similarities between PERT and CPM

PERT(Program Evaluation and Review Technique) | CPM (Critical Path Method)

_____________________________________ | ______________________________________

1)PERT is a probabilistic tool used with three 1)CPM is a deterministic tool, with only single

Estimating the duration for completion of estimate of duration.

activities.

_______________________________________________________________________________

2)This tool is basically a tool for planning 2)CPM also allows and explicit estimate of

and control of time. costs in addition to time, therefore CPM can

control both time and cost.

_______________________________________________________________________________

3)PERT is more suitable for R&D related 3)CPM is best suited for routine and those

projects where the project is performed for projects where time and cost estimates can

the first time and the estimate of duration be accurately calculated.

are uncertain.

_______________________________________________________________________________

4)The probability factor i major in PERT 4)The deterministic factor is more so values or

so outcomes may not be exact. outcomes are generally accurate and

realistic.

_______________________________________________________________________________

Extensions of both PERT and CPM allow the user to manage other resources in addition to time and money, to trade off resources, to analyze different types of schedules, and to balance the use of resources.tensions of both PERT and CPM allow the user to manage other resources in addition to time and money, to trade off resources, to analyze different types of schedules, and to balance the use of resources.

User Avatar

Wiki User

15y ago

What else can I help you with?

Continue Learning about Management

What are the limitations of PERT?

PERT/CPM suffers mainly suffers from a main issue is that when the network becomes very big (eg containing hundreds of activities) it becomes almost impossible to handle (printing, reading, etc...). Comparing CPM to CCPM we discover that CCPM has a better utilization of project resources, among other advantages.


Difference between gantt chart and CPM?

Gantt chart is a tool which is useful in scheduling the various activities of a project in the form of horizontal bar graph where as CPM provides a graphical view and network of events and activities in chronological manner.


What is the difference between pert and gantt chart?

PERT chart is a technique for scheduling a project based on individual tasks or activities whereas Gantt Chart is a bar chart that represents the tasks and activities of the project schedule.Source: Satzinger, J., Jackson, R., Burd, S. "Systems Analysis and Design in a changing world" Fifth Edition, Cengage Learning, Boston.


Discuss the use of PERT and CPM as effective tools in project management?

1.identification of component 2.sequencing of activities and event 3.time analysis 4.determination of critical path 4.modification in initial path 5.controlling the project


What is CPM?

CPM is a term in advertising which stands for cost per mile. But it is basically about the cost per thousand impression or view. CPM are specifically targeted at advertisers that want others to view their advertisement. In CPM ad networks, advertisers pay for the amount of traffic that simply views the advertisement. CPM advertising comes in various forms. Banner ads, popup, popunder are some of the popular kinds of CPM advertising model.

Related Questions

Similarities between PERT and CPM?

Both are used for planning and scheduling. Steps to create both networks are similar


Explain the differences between CPM and Pert Techniques?

kamil_ka@list.ru


Full form of pert and cpm?

CPM -Critical Path Method


What is the different between critical path method and program evaluation and review technique?

Program Evaluation and Review Technique (PERT) lays the foundation of the network diagram or process by which the program will be completed. The Critical Path Method (CPM) is used within PERT to determine a critical path for a project within a program or the program itself if all the duration information is known for the program. CPM is a subset of PERT.


What is cpm and pert?

Critical Path Method (CPM) - A schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram.


What is PERT charts?

Program Evaluation and Review Technique: is a network technique that uses three times estimates for each activity in a project. PERT is probalistic, whereas CPM is deterministic.


Is Cpm software available on the internet?

Yes, CPM software is available on the internet. 3d2f.com/tags/cpm/pert/ is a website with free CPM softward downloads. Yes, CPM software is available on the internet. There are many different companies that provide the software at different prices. You can look at the various places to see what requirements you need.


What are the four traditional techniques of managerial control?

Statistical Control Reports Break Even Analysis PERT CPM


What are the limitations of PERT?

PERT/CPM suffers mainly suffers from a main issue is that when the network becomes very big (eg containing hundreds of activities) it becomes almost impossible to handle (printing, reading, etc...). Comparing CPM to CCPM we discover that CCPM has a better utilization of project resources, among other advantages.


What has the author R D Archibald written?

R. D. Archibald has written: 'Network-based management systems (PERT/CPM)'


Should a PERT CPM network become a means of understanding reports and schedules or should it be vice versa?

A PERT CPM network should primarily serve as a tool for understanding reports and schedules, as it visually represents project tasks, their dependencies, and timelines. By using the network to clarify and analyze project data, stakeholders can effectively manage resources and identify critical paths. Conversely, reports and schedules should be derived from the insights provided by the PERT CPM network, ensuring that they accurately reflect project progress and timelines. This approach enhances decision-making and project control.


What has the author Joseph J Moder written?

Joseph J. Moder has written: 'Project management with CPM, PERT, and precedence diagramming' -- subject(s): Critical path analysis, PERT (Network analysis), Project management