answersLogoWhite

0

Rigsaver is a swing-gate, spring-operated air shut-off device mounted in the air intake system. It will impede the airflow into the cylinders and positively stop the engine. It can be installed pre- or post-turbo. Rigsaver can be manually or automatically controlled to respond to a variety of fault or hazard conditions.

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Mechanical Engineering

What is a kelly?

A kelly is a part of an oil rig.


What job does a mechanical engineer get on an oil rig?

mechanical engineering.


How many moving parts does an oil rig have?

An oil rig can have thousands of moving parts, depending on its design and complexity. Key components include the drilling rig itself, pumps, motors, and various mechanical systems used for drilling and extracting oil. The exact number varies based on the type of rig (e.g., offshore vs. onshore) and the technology employed. Regular maintenance is crucial to ensure these moving parts function effectively.


What is the function of a derrick on an oil rig?

A derrick on an oil rig serves as a tall structure that supports the drilling equipment used to extract oil and gas from underground reservoirs. It provides the necessary height for the drilling apparatus, allowing for the insertion and removal of drill pipes and casings. Additionally, the derrick aids in the safe handling of heavy equipment and materials, ensuring efficient and safe drilling operations. Ultimately, it is a critical component for facilitating the drilling process in offshore and onshore oil extraction.


What is onshore oil rig mechanics scope of work?

The scope of work for onshore oil rig mechanics includes the maintenance, repair, and operation of drilling equipment and machinery used in oil extraction. This involves troubleshooting mechanical issues, performing routine inspections, and ensuring compliance with safety regulations. Mechanics are also responsible for installing new equipment and conducting preventive maintenance to minimize downtime. Additionally, they may collaborate with engineers and other technicians to enhance operational efficiency and address any technical challenges that arise on the rig.

Related Questions

What is the name of the device used to extract oil and gas from the ground?

The device used to extract oil and gas from the ground is called a "drilling rig" or "oil rig". It is a large structure equipped with machinery and equipment for drilling wells and extracting oil and gas from underground reservoirs.


How does someone pick an oil rigs location?

After exploration has been done and oil deposits have been found, the exact location of an oil producing rig is based on the location of these oil deposits. It will be placed in a way that it is centered within close proximity of the oil field. As there will be multiple wells on a single oil rig, the wells are drilled deviated from the rig to the zone that contains the oil.


When was the first oil rig built?

The first oil rig is generally considered to be the one built by Edwin Drake in 1859 in Titusville, Pennsylvania. This rig, known as the Drake Well, marked the beginning of the modern petroleum industry and was a significant advancement in oil extraction techniques. Prior to this, oil was typically gathered from surface seeps or dug from wells by hand. The success of Drake's rig led to the rapid development of the oil industry.


What is an oil rig operator?

Oil rig operators run and manage an installation. The acreage of land that the oil reservoir resides is owned (leased) by the Oil Company. The Oil Company will pay a Drilling Contractor to drill the reservoir. The Drilling Contractor will own the drilling rig and will be the Rig Operator. The Oil Company will also employ Service Companies to perform certain functions on the rig during drilling. With a drilled and completed well the Oil Company may develop the location and install a Platform (if offshore) to produce numerous wells. The Oil Company may operate the platform itself or employ an Operating Company to manage the platform and production. Again, Service Companies may be employed to carry out remedial work on the oil wells from the platform.


What caused the big fire in the Gulf of Mexico?

On April 20, the Macondo well blew out, causing oil and gas to enter the rig floor. As the crew was evacuating the rig, the oil and gas caught fire. There was also oil stored on the platform which also caught fire. The fire was put out as the rig (Deepwater Horizon) sank in the gulf.


How did the oil rig start exploding with oil?

Because a device in the pipe which collects the oil broke. The device is used for separating methane gas from oil since it was broken the methane hgas rushed up and the oil rig caught fire.


Why have oil rig been built in the middle of the sea?

They are built on land and towed to sea to the drilling site where the oil or gas is.


What is the drilling platform in the sea that is two words?

Oil rig oil Derick


What are derricks mainly used for?

A derrick is a rig, typically associated with the drilling for and extraction of oil or natural gas.


What are the different job positions on an oil rig?

I am looking for a job as a chef on an oil rig


Are you more likely to see an oil rig on boat or on a truck?

on a oil rig boat


What is the difference between and oil rig and an oil platform?

An oil rig is an oil platform or oil production platform. A drilling is different though.