That means the ramp rises 1 inch for every foot traveled. So, if you have a ramp that is 8 feet long it will have 8 inches of rise. If you have 12 inches of rise, then your ramp has to be 12 feet long.

User Avatar

Wiki User

9y ago

What else can I help you with?

Related Questions

What is the House building cost per square foot northwest UK?

What is the House building cost per square foot northwest and is this just for the building work only or does this include the interior


What are Inch pounds compared to foot pounds?

The conversion between inch pound and foot pounds are given .On finding the relation we get as follows . So, 1 foot pounds =12 inch pounds .


How do you work out the gradiant on a ramp?

Divide the height of the ramp by the length of the ramp (rise over run).


i need a deck im ahandicap i use ascooter?

You need to contact a construction company and get a quote for building a deck/ramp that will work for your home.


What is the average construction cost per square foot for a butler building?

The average construction cost per square foot of a Butler building is about $15 to $20. Much can be save by doing the work oneself.


What is 193 inches converted into feet?

There are 12 inches in a foot. This would work out to 16 feet and 1 inch.


How does ramps work?

a ramp is a flat surface which


How does the inclined plane work?

It works like a ramp.


How does a ramp work?

to give you a better oppritunity to do aerial flips and variations while in air


What is the efficiency of a ramp if the input work is 96 j and the output work is 24j?

The efficiency of the ramp is 25%. This is calculated by taking the ratio of output work to input work, which in this case is 24 J / 96 J = 0.25, or 25%.


Does an inclined plane make work harder?

No, it makes work easier at the expense of more work. Climbing stairs can be done faster than climbing a ramp, but climbing the ramp is easier, since it is less work over a longer time.


How much work in joules has been done when you reach the top of the ramp?

The work done is equal to the change in potential energy. If the ramp has a height of h meters, the work done is mgh Joules, where m is the mass of the object, g is the acceleration due to gravity, and h is the height of the ramp.