answersLogoWhite

0

Most of the time it comes off the next day. Some will strip it the same day. I just think that is too soon.

Can depend on the mix design of the concrete and what type of cement is used. Can range from 5min to days. Concrete at precast plants that make sewer structures will remove the forms 5min after because of the mix design (0 slump / rapid setting / high strength gain). Bridge girders will be striped 12 - 24 hours after concrete has been placed (high early strength gain cement). Other form work in construction is based of cement type used in the mix design of the concrete or contractors decisions (1 or more days).

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

How long can you leave concrete forms on before it becomes a problem?

Concrete forms should generally be left in place for at least 24 to 48 hours to allow the concrete to properly set and cure. Leaving the forms on for too long can make it difficult to remove them and may result in damage to the concrete.


How can I create concrete forms effectively?

To create concrete forms effectively, start by planning the design and dimensions of the form. Use sturdy materials like plywood and stakes for support. Ensure the form is level and properly secured before pouring the concrete. Use a release agent to prevent sticking and smooth the surface for a clean finish. Allow the concrete to cure properly before removing the form.


How to form concrete effectively for construction projects?

To form concrete effectively for construction projects, follow these steps: Prepare the site by leveling and compacting the ground. Build sturdy forms using wood or metal to contain the concrete. Place reinforcement such as rebar or wire mesh within the forms. Mix the concrete ingredients thoroughly and pour into the forms. Use a vibrator to remove air bubbles and ensure proper compaction. Finish the surface with a trowel for a smooth and level finish. Allow the concrete to cure properly before removing the forms.


How to properly prepare and pour a concrete floor?

To properly prepare and pour a concrete floor, follow these steps: Prepare the site by clearing and leveling the area, ensuring proper drainage. Install a vapor barrier to prevent moisture from seeping into the concrete. Build forms to contain the concrete and provide a guide for pouring. Mix the concrete according to the manufacturer's instructions. Pour the concrete evenly into the forms, using a screed to level and smooth the surface. Use a bull float to further smooth and level the concrete. Allow the concrete to cure for the recommended time before removing the forms and finishing the surface as desired.


How can I effectively utilize DIY concrete forming techniques for my upcoming project?

To effectively utilize DIY concrete forming techniques for your project, start by researching and understanding the different types of forms available. Plan your project carefully, ensuring accurate measurements and proper materials. Use tools such as stakes, screws, and braces to secure the forms in place. Consider using release agents to prevent the concrete from sticking to the forms. Finally, pour the concrete carefully and allow it to cure properly before removing the forms.


How are forms built for concrete?

All forms should be well constructed.All forms should be carefully aligned.It should be subtle and firm.All forms should be securely braced and fastened together in their final position.


How can I make moldable concrete?

To make moldable concrete, mix concrete with a polymer additive that increases its flexibility and workability. This allows the concrete to be shaped and molded into various forms before it hardens.


How can I effectively construct building concrete forms for my upcoming construction project?

To effectively construct building concrete forms for your construction project, follow these steps: Plan the layout and dimensions of the forms. Use quality materials such as plywood and lumber. Ensure the forms are properly braced and supported. Use stakes to secure the forms in place. Check for level and alignment before pouring concrete. Remove the forms carefully after the concrete has set.


How are poured concrete wall forms used in the construction process?

Poured concrete wall forms are used in construction to create the shape and structure of concrete walls. These forms are typically made of wood, metal, or plastic and are placed in position before pouring concrete into them. Once the concrete has hardened, the forms are removed, leaving behind a solid concrete wall. This method allows for precise and consistent wall construction in various shapes and sizes.


How long should wood forms stay on concrete?

overnight till it sets


What are the recommended instructions for using Quikrete 5000 concrete mix for a DIY project?

To use Quikrete 5000 concrete mix for a DIY project, follow these steps: Wear protective gear like gloves and a mask. Mix the concrete with water according to the instructions on the bag. Pour the mix into your project area and level it with a trowel. Allow the concrete to cure for at least 24 hours before removing any forms or finishing the surface.


What are the different setting forms for concrete?

The different setting forms for concrete include slab, beam, column, and wall forms. These forms are used to shape and support the concrete as it hardens and cures into a solid structure.