It would depend on what you mean by 'build'. There are many contributions made by any number of people when constructing a house, from the design and site layout to the final cleaning before habitation. And much would depend on the various amenity levels which are chosen for the home. A full set of plans would be required to provide even the roughest estimate of labor required.
The cast of Build Your Own Haunted House - 2000 includes: Brian Peck as The Count
The time it takes to build a 2000 sq ft house from start to finish can vary, but on average it can take around 6-8 months.
How many trees it takes to build a house depends on the size, style and finish of the house. It varies considerably. According to the Idaho Forest Products Commission, a typical 2000 square foot house requires 26,700 board feet. An "average" tree with a 20 inch diameter and 42 linear feet of usable wood generates approximately 260 board feet. Doing the math indicates about 102 trees for that house. Other organizations in the lumber industry state different numbers, some as low as 30 trees for a 1500 square foot house while some state 60 trees for a 2000 square foot house.
2000 bags
1 square = 100 square feet = 9.29 square metersSo a house of 20 squares would be 2000 square feet or 185.8 square meters.
20 squares or 60 bundles
20-30 tones (200000 kg
Rule of thumb is 1.5 tons per 1000 square feet of home.
The average size of a house in 1958 was around 1000 square feet. As of 2014, that number has doubled as the average house is 2000 sq. ft.
The cost to build a 3-roomed house in Kenya can vary widely depending on factors such as location, size, quality of materials, and labor costs. On average, it could cost between $15,000 to $30,000. It is recommended to obtain quotes from local contractors to get a more accurate estimate.
Typically they are 2000 - 3000 square feet.
Blitz Build 2000 - 2000 TV was released on: USA: 17 September 2000