This process, called the butt-weld process is the basis for our current pipe-making procedures. In his method, thin sheets of iron were heated and drawn through a cone-shaped opening. As the metal went through the opening, its edges curled up and created a pipe shape. The two ends were welded together to finish the pipe. The first manufacturing plant to use this process in the United States was opened in 1832 in Philadelphia. So the method is the two sides are welded as they butt together without overlapping. The same method is used to weld two pipes together as they are butted together and welded around the seams.
A butt weld is a weld made between two straight cut profiles , a socket , or plug weld is made between a surface and a hole.
Socket weld, because it's stronger; butt weld, because it uses less metal. The "best" weld depends on what you're building.
Butt weld and groove weld are two common types of weld joints used in welding processes. A butt weld is a type of weld where two pieces of metal are joined together along their edges in a single plane, creating a smooth, flush surface. On the other hand, a groove weld is a type of weld where a groove or channel is created in one or both of the pieces being joined, and the filler material is deposited into the groove to create the weld. Both types of weld joints are used in various applications depending on the specific requirements of the project.
To support the molten metal while it is cooling
To unite by a butt weld.
Whenever 2 pcs. of metal come together at an angle to each other. Butt welds are 2 pcs of metal that meet edge to edge.
two to three mm
Butt weld is a type of joint for welding.At this type,the connection area is put in front of each other.Another method of connection is "Socket weld"in which two parts are male and female,one goes into the other then welding operation is done.
It is the heat affected zone. It differs in every weld. but a good rule of thumb is .25" on either side of the weld
there are 3 types of welded joint 1-butt weld butt weld is the type which need usually 4 mm clearance between the 2 edge of pipe or plate you want to weld it. 2-socket weld 3-seal weld
tell me full penetration joint process
Usually it's not considered to be strong enough.