Modular homes can be built (in America) in a matter of days.
Small one-story homes on a slab foundation can be built in a few weeks.
Average one-story homes with attic, basement, and garage, and built with permits and inspections usually take about 2 months for a moderate sized professional crew. Add a little time for a second story house.
Custom homes with all the trimmings can take 6 months to a year or more.
they used long wooden planks to build their houses
When I had to build a pit house model I built it out of legos. Then I covered it it brown play dough.
So You Want to Build a House - 1948 was released on: USA: 15 May 1948
House Crashers - 2009 Basement Build Out 5-4 was released on: USA: 2011
A lot
4 to 5 months
7000000000000 CENTURIES
a house that took long to build
It took 5 years to build.
7000000000000 CENTURIES
10 years!
is mud and dry mud
1 and a half years
Contractors can typically build a house within a couple of months. It varies based on the complexity of the house and the number of workers deployed to helping with the construction.
It generally take 6 months to one year to build a house. There is different factor that affect the time to build the house like weather condition, availability of materials and manpower, size of project and many more.
it takes about 1-5
i have no idea so what evers