1 brass= 1oo cu ft
To calculate the amount of 2 rock needed to fill a space measuring 23' x 24' x 5', first find the volume in cubic feet: 23 x 24 x 5 = 2,760 cubic feet. Since 1 ton of 2 rock typically covers about 0.5 cubic yards, and there are 27 cubic feet in a cubic yard, you would need approximately 2,760 / 27 = 102 cubic yards. Therefore, you would need around 102 tons of 2 rock to fill the space.
53 centimeters = 1.74 feet.
There are 0.3048 metres in one foot. Therefore, 51 feet is equal to 51 x 0.3048 = 15.5448 metres.
Your bag should tell you how many cubic feet it makes. 1 foot = 12 inches. 15 x 12 = 180 + 5 = 185 2 x 12 = 24 + 11 = 35 7 x 12 = 84 + 6 = 90 185 x 35 x 90 = 582750 cubic inches 582750 divided by 1728 (1 square foot in inches) = 337.24 cubic feet. Divide that by the number of cubic feet your bag of mix provides and you will know how many bags you need.
approx. 74 yards Sorry, Dabar, but I think you have not accounted for the conversion of cu. feet to cubic yards...my calculations are as follows...... 40 X 17 is equal to 680 cubic FEET of area. You take the 680 and divide by 27 to get the cu. YARDS of concrete. (25.1 cu. yds) Then because you only want the slab 4 inches thick, you multiply by .33 (or 8.25 cu. yards of concrete) Then you allow 10 % for waste or shortage....(make this about a yard...so, 8.25 and one for waste/shortage is equal to 9.25 cu. yards of Concrete for this project)
17,116 cubic feet is equal to about 484.7 cubic meters.
54 cubic feet is equal to 2.07 cubic yards.
1 titanium
0.73524306 Cubic Feet
1 cubic foot is equal to 29.922 quarts. Therefore, 54 quarts is approximately equal to 1.8 cubic feet.
6,566.4 cubic inches = 3.8 cubic feet
975 cubic meters = 34,431.8 cubic feet.
1,172 cubic inches is about 0.68 cubic feet.
12.5 cubic feet equates to 0.354 cubic meters.
44 fluid ounces equal 0.04595 cubic feet.
135
25 gallons is 3.34 cubic feet.