answersLogoWhite

0

I never played The Witcher 1 and 2 and I enjoyed the witcher 3. I would probably consider it one of my favorite games of all time.

User Avatar

Dillon Hess

Lvl 7
4y ago

What else can I help you with?

Related Questions

Can you run The Witcher 2 Assassins of Kings?

You can run The Witcher 2: Assassins of Kings on a computer.


How many episodes will The Witcher Netflix TV series have?

Season 1 has 8 episodes. There is also season 2 of the witcher in the works that is scheduled for reason in 2021 with a unspecified number of episodes.


Will the witcher assassins of kings be on xbox 360?

Yes, Witcher 2: Assassin of Kings was released on XBox 360.


How do you change the graphics of The Witcher 2 if you have the patch 1.3 and Launcher.exe has not installed?

Go to your internet security system like Norton and go to the Quarentine area and The Witcher 2 Launcher.exe should be there. Simply recover it and you're done.


Can you install The Witcher 2 disc to a computer so you can play disc-free?

Yes you can.


What are the release dates for Brody Stevens Enjoy It - 2012 Breakdown 1-2?

Brody Stevens Enjoy It - 2012 Breakdown 1-2 was released on: USA: 1 December 2013


Can I play Witcher 2 without playing the first one?

Yes. I did and had a fun time playing it.


2x2 5x -2?

=2x2+x+4x+2=x(2x+1)+2(2x+1)=(2x+1)(x+2) by spaz licker enjoy slag ;)


What is the minimum percentage of steel required in R.C.C.?

Percentage of steel in RCC is about 1-2%.


What are the release dates for Three - 1998 You Are Cordially Required 1-1?

Three - 1998 You Are Cordially Required 1-1 was released on: USA: 2 February 1998


How do you get witcher 2 for free?

Good Old Games did a giveaway offer at Christmas, keep an eye out for similar offers in the future.


10 Men can make a wall in 8 days. How many men required to complate the same work in half day?

The Number of men required is 160 Explanation: Let no. of men = m1 = 10 Let no. of days required = d1 = 8 Let no. of men required to finish the work in 1/2 days = m2 Let no of days required for m2 men = 1/2 Now we have to find the no. of men required to complete the work in 1/2 day so the calculation will be, m1d1 = m2d2 (10)(8) = m2(1/2) 80 = m2(1/2) [ By taking the dividend 2 left side it will go into multiple ] 80 x 2 = m2 160 = m2 Therefore, Number of men required to finish the work in 1/2 day is **160 men**